Article 4 Amendments to Part 3 (Requirements) of Schedule 1 (Authorised project)

Original text. Later amendments are not shown.

Part 3 (Requirements) of Schedule 1 (Authorised project) is amended as follows—

(1)

For paragraph 3(8) substitute—

“(8)

In the case of two offshore phases, taken together the combined offshore phases must not exceed—

(a)

an offshore wind turbine generating station with a gross electrical output capacity of up to 1,400 MW comprising up to 172 wind turbine generators;

(b)

up to one accommodation platform;

(c)

up to two meteorological masts;

(d)

up to 12 buoys fixed to the sea bed; and

(e)

up to 6 offshore electrical stations.”

(2)

After paragraph 3(8) insert—

“(9)

The total number of gravity base foundations must not exceed 100.”