# The East Anglia THREE Offshore Wind Farm Order 2017, Paragraph 3

Extent: E+W+S

(1) The total number of offshore electrical stations forming part of the authorised project must not exceed one, the total number of accommodation platforms must not exceed one and the total number of meteorological masts must not exceed two.
(2) The dimensions of any offshore electrical station forming part of the authorised project (excluding towers, helipads, masts and cranes) must not exceed 70 metres in height when measured from LAT, 80 metres in length and 120 metres in width.
(3) The dimensions of any accommodation platform forming part of the authorised project must not exceed 60 metres in height when measured from LAT, 70 metres in length and 70 metres in width.
(4) Each meteorological mast must not exceed a height of 160 metres above LAT.
(5) Each meteorological mast must not have more than one supporting foundation.
(6) The dimensions of any buoy forming part of the authorised project must not exceed 6 metres in height (excluding any apparatus or equipment fixed to the buoy), 4 metres in length and 4 metres in width and the anchor footprint must not exceed 4m².
(7) Offshore platforms forming part of the authorised project must not be erected within the platform exclusion zone, whose co-ordinates are specified below—
Point
Latitude (DMS)
Longitude (DMS)
Point
Latitude (DMS)
Longitude (DMS)
1
52° 30′ 20.0268″N
2° 48′ 33.264″E
3
52° 32′ 10.4568″N
2° 45′ 31.9572″E
2
52° 31′ 32.0664″N
2° 45 ′ 31.8672″E
4
52° 30′ 48.7369″N
2° 48′ 57.7512″E
(8) In the case of two offshore phases, taken together the combined offshore phases must not exceed—
(a) an offshore wind turbine generating station ... comprising up to 100 wind turbine generators;
(b) up to one accommodation platform;
(c) up to two meteorological masts;
(d) up to 12 buoys fixed to the sea bed; and
(e) up to one offshore electrical station.
(9) The total number of gravity base foundations must not exceed 100.

---
Source: https://www.legislation.gov.uk/uksi/2017/826/schedule/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/east-anglia-three-offshore-wind-farm-order-2017/schedule-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.