(1) The total length of the cables and the volume of their cable protection must not exceed the following—
Work
Length
Cable protection
Work No. 1(e) (inter-array)
550 kilometres
49,500 m3
Work No. 3 (platform link)
240 kilometres
28,480 m3
Work No. 4 (interconnection)
380 kilometres
47,960 m3
Work No. 5A (export cable)
664 kilometres
81,260 m3

---