# The East Anglia TWO Offshore Wind Farm Order 2022, Paragraph 4: Detailed offshore design parameters

Extent: E+W+S

(1) The total length of the inter-array cables comprised within Work No. 1(c) must not exceed 200 kilometres.
(2) The total length of the platform link cables comprised within Work No. 4 must not exceed 75 kilometres.
(3) The total length of the export cables comprised within Work Nos. 5 and 6 must not exceed 160 kilometres.

---