# The East Anglia TWO Offshore Wind Farm Order 2022, Paragraph 5: Detailed offshore design parameters

Extent: E+W+S

(1) In relation to a wind turbine generator, each gravity base foundation must not have a diameter at the level of the seabed which is more than 60 metres;
(2) In relation to a wind turbine generator, each suction caisson foundation must not have a diameter at the level of the seabed which is more than 35 metres;
(3) In relation to a wind turbine generator, each jacket foundation must not have—
(a) a pile diameter which is more than 4.6 metres in the case of pin piles or a suction caisson diameter which is more than 16 metres;
(b) more than four piles or more than four suction caissons; and
(c) more than four legs.
(4) In relation to a wind turbine generator, each monopile foundation must not have a diameter which is more than 15 metres.

---
Source: https://www.legislation.gov.uk/uksi/2022/433/schedule/1/paragraph/5 (the official version)
Page: https://openlegislation.uk/east-anglia-two-offshore-wind-farm-order-2022/schedule-1/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.