# The East Anglia TWO Offshore Wind Farm Order 2022, Paragraph 3: Design parameters

Extent: E+W+S

The total length of the cables forming part of the authorised scheme and the authorised scheme in licence 1 (generation) and the volume and area of their cable protection must not exceed the following (whether installed under this licence or licence 1 (generation))—
Work
Length
Area of cable protection
Volume of cable protection
Work No. 4 (platform link cables)
75 kilometres
104,550 m2
117,588 m3
Work Nos. 5 and 6 (export cables)
160 kilometres
108,800 m2
122,368 m3

---