  "url": "https://openlegislation.uk/east-anglia-two-offshore-wind-farm-order-2022/schedule-17/part-1",
  "json_url": "https://openlegislation.uk/east-anglia-two-offshore-wind-farm-order-2022/schedule-17/part-1.json",
  "legislation": "uksi/2022/433",
  "legislation_title": "The East Anglia TWO Offshore Wind Farm Order 2022",
  "legislation_url": "https://openlegislation.uk/east-anglia-two-offshore-wind-farm-order-2022",
  "path": "schedule/17/part/1",
  "kind": "part",
  "number": "1",
  "heading": "Documents forming the environmental statement to be certified",
  "text": "(1)\n(2)\n(3)\n(4)\n(5)\nDocument Reference\n(and relevant ES Chapters)\nExamination Library Reference\n(and relevant ES Chapter reference)\nDocument Name\nVersion\nDate\n6.1\nAPP-049 to APP-079\nEnvironmental Statement\n1\n25th October 2019\n6.2\nAPP-080 to APP-441\nFigures\n1\n25th October 2019\n6.3\nAPP-442 to APP-571\nTechnical Appendices\n1\n25th October 2019\nExA.WQ-1.A10.D1.V1\n(Chapter 6)\nREP1-099\n(APP-054)\nApplicants’ Responses to WQ1 Appendix 10 Landfall Indicative HDD Working Area\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A11.D1.V1\n(Chapter 6)\nREP1-100\n(APP-054)\nApplicants’ Responses to WQ1 Appendix 11 Landfall HDD Cross Sections\n1\nDeadline 1\n2nd November 2020\nExA.AS-13.D6.V1\n(Chapter 6)\nREP6-024\n(APP-054)\nHDD Verification Clarification Note\n1\nDeadline 6\n24th February 2021\nExA.WQ-1.A6.D1.V1\n(Chapter 6)\nREP1-090\n(APP-054)\nApplicants’ Responses to WQ1 Appendix 6 Illustrative Open Trench and Trenchless Onshore Cable Route\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A7.D1.V1\n(Chapter 6)\nREP1-091\n(APP-054)\nApplicants’ Responses to WQ1 Appendix 7 Onshore Crossing Schedule\n1\nDeadline 1\n2nd November 2020\nExA.AS-10.D3.V1\n(Chapter 6)\nREP3-056\n(APP-054)\nOnshore Cable Route Works Programme Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.AS-11.D3.V1\n(Chapter 6)\n(Chapter 29)\nREP3-057\n(APP-054)\n(APP-077)\nOnshore Substations Update Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.AS-12.D3.V1\n(Chapter 6)\nREP3-058\n(APP-054)\nConstruction in Proximity to Properties\n1\nDeadline 3\n15th December 2020\n6.3.6.2\n(Chapter 6)\nREP8-015\n(APP-054)\nEA2 Environmental Statement Appendix 6.2 Relationship of Onshore Plans Secured by the DCO\n5\nDeadline 8\n25th March 2021\n6.3.6.3\n(Chapter 6)\nREP8-016\n(APP-054)\nEA2 Environmental Statement Appendix 6.3 Relationship of Offshore Plans Secured by the DCO\n5\nDeadline 8\n25th March 2021\n6.3.6.4\n(Chapter 6)\nREP3-020\n(APP-054)\nEA2 Environmental Statement Appendix 6.4 Cumulative Project Description\n2\nDeadline 3\n15th December 2020\nExA.RRA6.D0.V1\n(Chapters 7 to 17)\nAS-043\n(APP-055 to APP-065)\nApplicant’s Comments on Relevant Representations ... Appendix 6 Disposal Site Locations (Windfarm Site)\n1\n11th June 2020\nExA.RRA2.D0.V1\n(Chapter 7)\nAS-039\n(APP-055)\nApplicant’s Comments on Relevant Representations ... Appendix 2 Wave Climatology Clarification Note\n1\n11th June 2020\nExA.AS-13.D3.V1\n(Chapter 7)\n(Chapter 9)\n(Chapter 10)\n(Chapter 12)\nREP3-059\n(APP-055)\n(APP-057)\n(APP-058)\n(APP-060)\nEffects on Supporting Habitats of Outer Thames Estuary SPA Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.RRA3.D0.V1\n(Chapter 10)\nAS-040\n(APP-058)\nApplicant’s Comments on Relevant Representations ... Appendix 3 Fish and Shellfish Ecology Clarification Note\n1\n11th June 2020\nExA.AS-5.D11.V2\n(Chapter 11)\nREP11-045\n(APP-059)\nUnderwater Noise Modelling Report Update\n2\nDeadline 11\n7th June 2021\nExA.AS-3.D2.V1\n(Chapter 12)\nREP2-006\n(APP-060)\nCumulative Auk Displacement and Seabird Assemblage Assessment of FFC SPA and Gannet PVA\n1\nDeadline 2\n17th November 2020\nExA.AS-2.D11.V5 (Chapter 12)\nREP11-026\n(APP-060)\nDisplacement of red-throated divers in the Outer Thames Estuary SPA\n5\nDeadline 11\n7th June 2021\nExA.AS-20.D1.V1\n(Chapter 19)\n(Chapter 26)\nREP1-040\n(APP-067)\n(APP-074)\nDeadline 1 Air Quality Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.AS-16.D3.V1\n(Chapter 19)\nREP3-061\n(APP-067)\nDeadline 3 Air Quality Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.WQ-1.A8.D1.V1\n(Chapter 20)\nREP1-092\n(APP-068)\nApplicants’ Responses to WQ1 Appendix 8 Environment Agency Flood Zones\n1\nDeadline 1\n2nd November 2020\nExA.AS-9.D4.V2\n(Chapter 20)\nREP4-044\n(APP-068)\nClarification Note SuDS Infiltration Note\n2\nDeadline 4\n13th January 2021\nExA.AS-12.D6.V1\n(Chapter 18)\n(Chapter 20)\nREP6-021\n(APP-066)\n(APP-068)\nLandfall Hydrogeological Risk Assessment\n1\nDeadline 6\n24th February 2021\nExA.AS-13.D8.V1\n(Chapter 20)\nREP8-038\n(APP-068)\nFlood Risk and Drainage Clarification Note\n1\nDeadline 8\n25th March 2021\nExA.AS-11.D1.V1\n(Chapter 21)\nREP1-022\n(APP-069)\nLand Use Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A4.D1.V1\n(Chapter 22)\nREP1-088\n(APP-070)\nApplicants’ Responses to WQ1 Appendix 4 Ecological Mitigation Works\n1\nDeadline 1\n2nd November 2020\nExA.AS-12.D1.V1\n(Chapter 22)\nREP1-023\n(APP-070)\nOnshore Ecology Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.AS-16.D1.V1\n(Chapter 22)\nREP1-035\n(APP-070)\nEcological Enhancement Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.AS-14.D3.V1\n(Chapter 22)\nREP3-060\n(APP-070)\nDeadline 3 Onshore Ecology Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.AS-10.D4.V1\n(Chapter 22)\nREP4-005\n(APP-070)\nDeadline 4 Onshore Ecology Clarification Note\n1\nDeadline 4\n13th January 2021\nExA.AS-14.D6.V1\n(Chapter 22)\nREP6-025\n(APP-070)\nDeadline 6 Onshore Ecology Clarification Note\n1\nDeadline 6\n24th February 2021\nExA.AS-28.D6.V1\n(Chapter 22)\nREP6-035\n(APP-070)\nEcology Survey Results: February 2021\n1\nDeadline 6\n24th February 2021\nExA.AS-16.D8.V1\n(Chapter 22)\nREP8-041\n(APP-070)\nEcological Enhancement Clarification Note Addendum\n1\nDeadline 8\n25th March 2021\nExA.AS-10.D1.V1\n(Chapter 24)\n(Chapter 29)\nREP1-021\n(APP-072)\n(APP-077)\nArchaeology and Cultural Heritage Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.AS-13.D1.V1\n(Chapter 24)\nREP1-024\n(APP-072)\nPre-Construction Trial Trenching Report\n1\nDeadline 1\n2nd November 2020\nExA.AS-14.D1.V1\n(Chapter 24)\nREP1-025 to REP1-033\n(APP-072)\nOnshore Archaeology Geophysical Survey Report (Parts 1 to 9)\n1\nDeadline 1\n2nd November 2020\nExA.AS-15.D1.V1\n(Chapter 24)\nREP1-034\n(APP-072)\nOnshore Archaeology Earthworks Report\n1\nDeadline 1\n2nd November 2020\nExA.AS-29.D8.V1\n(Chapter 24)\nREP8-063\n(APP-072)\nCultural heritage Viewpoint 5 Additional Visualisation\n1\nDeadline 8\n25th March 2021\nExA.AS-16.D3.V1\n(Chapter 24) (Chapter 29)\nREP3-062 to REP3-068\n(APP-072)\n(APP-077)\nUpdated Photomontages Clarification Note\n1\nDeadline 3\n15th December 2020\nExA.AS-11.D4.V1\n(Chapter 24)\nREP4-006\n(APP-072)\nHeritage Assessment Addendum\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_001\n(Chapter 24)\nREP4-007\n(APP-072)\nHeritage Assessment Addendum Appendix 1 CHVP2 –PRoW between Friston Hall and Friston (Appendix 24.7, Figure 7 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_002\n(Chapter 24)\nREP4-008\n(APP-072)\nHeritage Assessment Addendum Appendix 2 CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_003\n(Chapter 24)\nREP4-009\n(APP-072)\nHeritage Assessment Addendum Appendix 3 CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_004\n(Chapter 24)\nREP4-010\n(APP-072)\nHeritage Assessment Addendum Appendix 4 CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_005\n(Chapter 24)\nREP4-011\n(APP-072)\nHeritage Assessment Addendum Appendix 5 CHVP7 – Friston House (b) (Appendix 24.7, Figure 12 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D4.V1_006\n(Chapter 24)\nREP4-012\n(APP-072)\nHeritage Assessment Addendum Appendix 6 CHVP8 – Friston War Memorial (Appendix 24.7, Figure 13 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-30.D11.V1\n(Chapter 24)\nREP11-075\nHeritage Assessment GIS Addendum\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_01\n(Chapter 24)\nREP11-076\nHeritage Assessment GIS Addendum App 1 CHVP2 App 24.7 Fig 7 Update\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_02\n(Chapter 24)\nREP11-077\nHeritage Assessment GIS Addendum App 2 CHVP3 App 24.7 Fig 8 Update\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_03\n(Chapter 24)\nREP11-078\nHeritage Assessment GIS Addendum App 3 CHVP4 App 24.7 Fig 9 Update\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_04 (Chapter 24)\nREP11-054\nHeritage Assessment GIS Addendum App 4 CHVP5 App 24.7 Fig 10 Update\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_05\n(Chapter 24)\nREP11-079\nHeritage Assessment GIS Addendum App 5 CHVP7 App 24.7 Fig 12 Update\n1\nDeadline 11\n7th June 2021\nExA.AS-30.D11.V1_06\n(Chapter 24)\nREP11-080\nHeritage Assessment GIS Addendum App 6 CHVP8 App 24.7 Fig 13\n1\nDeadline 11\n7th June 2021\nExA.AS-14.D8.V1\n(Chapter 25)\nREP8-039\n(APP-073)\nApplicants’ Position Statement on Noise\n1\nDeadline 8\n25th March 2021\nExA.AS-8.D2.V1\n(Chapter 25)\nREP2-011\n(APP-073)\nNoise and Vibration Assessment Clarification Note\n1\nDeadline 2\n17th November 2020\nExA.AS-8.D4.V1\n(Chapter 25)\nREP4-043\n(APP-073)\nNoise Modelling Clarification Note\n1\nDeadline 4\n13th January 2021\nExA.WQ-1.A14.D1.V1\n(Chapter 26)\nREP1-103\n(APP-074)\nApplicants’ Responses to WQ1 Appendix 14 Junction Locations\n1\nDeadline 1\n2nd November 2020\nExA.AS-8.D1.V1 (Chapter 26)\nREP1-048\n(APP-074)\nTraffic and Transport Clarification Note for Deadline 1\n1\nDeadline 1\n2nd November 2020\nExA.AS-6.D6.V2\n(Chapter 26)\nREP6-043\n(APP-074)\nSizewell C Cumulative Impact Assessment Note (Traffic and Transport)\n2\nDeadline 6\n24th February 2021\nExA.AS-9.D3.V1\n(Chapter 26)\nREP3-055\n(APP-074)\nTraffic and Transport Clarification Note for Deadline 3\n1\nDeadline 3\n15th December 2020\nExA.AS-26.D4.V1\n(Chapter 26)\nREP4-027\n(APP-074)\nTraffic and Transport Deadline 4 Clarification Note\n1\nDeadline 4\n13th January 2021\nExA.AS-9.D1.V1\n(Chapters 27 to 30)\nREP1-049\n(APP-075 to APP-078)\nPublic Rights of Way Clarification Note\n1\nDeadline 1\n2nd November 2020\nExA.AS-5.D2.V1\n(Chapter 28)\n(Chapter 29)\nREP2-008\n(APP-076)\n(APP-077)\nEffects with Regard to the Statutory Purposes of the Suffolk Coast and Heaths Area of Outstanding Natural Beauty and Accordance with NPS Policy\n1\nDeadline 2\n17th November 2020\nExA.AS-33.D8.V1\n(Chapter 28)\nREP8-075\n(APP-076)\nLandscape and Visual: Sizewell C Cumulative Impact Assessment\n1\nDeadline 8\n25th March 2021\nExA.WQ-1.A9.7.D1.V1\n(Chapter 29)\nREP1-093\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.7 EA2 Annotated Viewpoint 1\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A9.8.D1.V1\n(Chapter 29)\nREP1-094\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.8 EA2 Annotated Viewpoint 2\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A9.9.D1.V1\n(Chapter 29)\nREP1-095\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.9 EA2 Annotated Viewpoint 3\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A9.10.D1.V1\n(Chapter 29)\nREP1-096\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.10 EA2 Annotated Viewpoint 4\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A9.11.D1.V1\n(Chapter 29)\nREP1-097\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.11 EA2 Annotated Viewpoint 5\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A9.12.D1.V1\n(Chapter 29)\nREP1-098\n(APP-077)\nApplicants’ Responses to WQ1 Appendix 9.12 EA2 Annotated Viewpoint 8\n1\nDeadline 1\n2nd November 2020\nExA.AS-7.D2.V1\n(Chapter 29)\nREP2-010\n(APP-077)\nSizewell C Cumulative Impact Assessment Note (Landscape and Visual)\n1\nDeadline 2\n17th November 2020\nExA.AS-3.D4.V1\n(Chapter 29)\nREP4-031\n(APP-077)\nLandscape and Visual Impact Assessment Addendum\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_001\n(Chapter 29)\nREP4-032\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 1 Viewpoint 1 – Public Right of Way (PRoW) near Friston House (Figure 29.13 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_002\n(Chapter 29)\nREP4-033\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 2 Viewpoint 2 – Friston, Church Road (Figure 29.14 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_003\n(Chapter 29)\nREP4-034\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 3 Viewpoint 3 – Grove Road, near Pear Tree Farm (Figure 29.15 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_004\n(Chapter 29)\nREP4-035\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 4 Viewpoint 4 – Grove Road, near Church Road (Friston) (Figure 29.16 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_005\n(Chapter 29)\nREP4-036\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 5 Viewpoint 5 – PRoW near Moor Farm (Figure 29.17 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_006\n(Chapter 29)\nREP4-037\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 6 Viewpoint 6 – Friston, Village Green (Figure 29.18 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_007\n(Chapter 29)\nREP4-038\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 7 Viewpoint 8 – Saxmundham Road (North of Friston) (Figure 29.20 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-3.D4.V1_008\n(Chapter 29)\nREP4-039\n(APP-077)\nLandscape and Visual Impact Assessment Addendum Appendix 8 Viewpoint 9 – B1121 Aldeburgh Road, south of Friston (Figure 29.21 Update)\n1\nDeadline 4\n13th January 2021\nExA.AS-6.D7.V1\n(Chapter 29)\nREP7-062\n(APP-077)\nUpdated Figure 29.37- Viewpoint 5 Public Rights of Way, near Moor Farm (with National Grid GIS Substation)\n1\nDeadline 7\n4th March 2021\nExA.AS-28.D8.V1_01\n(Chapter 29)\nREP8-055\n(APP-077)\nNational Grid GIS Substation Photomontages: Figure 29.13 Update Viewpoint 1 Public Rights of Way near Friston House\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_02\n(Chapter 29)\nREP8-056\n(APP-077)\nNational Grid GIS Substation Photomontages: Figure 29.14 Update Viewpoint 2 Friston, Church Road\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_03\n(Chapter 29)\nREP8-057\n(APP-077)\nNational Grid GIS Substation Photomontages: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_04\n(Chapter 29)\nREP8-058\n(APP-077)\nNational Grid GIS Substation Photomontages: Figure 29.20 Update\nViewpoint 8 Saxmundham Road (North of Friston)\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_05\n(Chapter 29)\nREP8-059\n(APP-077)\nNational Grid GIS Substation Photomontages: Figure 29.21 Update Viewpoint 9: B1121 Aldeburgh Road (south of Friston)\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_06\n(Chapter 29)\nREP8-060\n(APP-077)\nNational Grid GIS Substation Photomontages: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update)\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_07\n(Chapter 29)\nREP8-061\n(APP-077)\nNational Grid GIS Substation Photomontages: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update)\n1\nDeadline 8\n25th March 2021\nExA.AS-28.D8.V1_08\n(Chapter 29)\nREP8-062\n(APP-077)\nNational Grid GIS Substation Photomontages: CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10-Update)\n1\nDeadline 8\n25th March 2021\nExA.AS-30.D8.V1_01\n(Chapter 29)\nREP8-066\n(APP-077)\nDifferent colour schemes for Substations Design Principles Statement : Viewpoint 1 Public Rights of Way near Friston House\n1\nDeadline 8\n25th March 2021\nExA.AS-30.D8.V1_02\n(Chapter 29)\nREP8-067\n(APP-077)\nDifferent colour schemes for Substations Design Principles Statement: Viewpoint 2 Friston, Church Road\n1\nDeadline 8\n25th March 2021\nExA.AS-30.D8.V1_03\n(Chapter 29)\nREP8-068\n(APP-077)\nDifferent colour schemes for Substations Design Principles Statement: Viewpoint 9 – B1121 Aldeburgh Road, south of Friston\n1\nDeadline 8\n25th March 2021\nExA.AS-31.D8.V1_01\n(Chapter 29)\nREP8-071\n(APP-077)\nViewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.14 Update Viewpoint 2 Friston, Church Road\n1\nDeadline 8\n25th March 2021\nExA.AS-31.D8.V1_02\n(Chapter 29)\nREP8-072\n(APP-077)\nViewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm\n1\nDeadline 8\n25th March 2021\nExA.AS-31.D8.V1_03\n(Chapter 29)\nREP8-073\n(APP-077)\nViewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston)\n1\nDeadline 8\n25th March 2021\nExA.AS-31.D8.V1_04\n(Chapter 29)\nREP8-069\n(APP-077)\nViewpoint Photomontages with Potential National Grid Extension Bays: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update)\n1\nDeadline 8\n25th March 2021\nExA.AS-31.D8.V1_05\n(Chapter 29)\nREP8-070\n(APP-077)\nViewpoint Photomontages with Potential National Grid Extension Bays: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update)\n1\nDeadline 8\n25th March 2021\nExA.AS-32.D8.V1\n(Chapter 29)\nREP8-074\n(APP-077)\nExtension of National Grid Substation Appraisal\n1\nDeadline 8\n25th March 2021\nExA.AS-4.D11.V1\n(Chapter 29)\nREP11-028\nLandscape and Visual Impact Assessment GIS Addendum\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_01\n(Chapter 29)\nREP11-029\nLVIA GIS Addendum Appendix 1 Viewpoint 1 Figure 29.13 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_02\n(Chapter 29)\nREP11-030\nLVIA GIS Addendum Appendix 2 Viewpoint 2 Figure 29.14 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_03\n(Chapter 29)\nREP11-031\nLVIA GIS Addendum Appendix 3 Viewpoint 3 Figure 29.15 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_04\n(Chapter 29)\nREP11-032\nLVIA GIS Addendum Appendix 4 Viewpoint 4 Figure 29.16 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_05\n(Chapter 29)\nREP11-033\nLVIA GIS Addendum Appendix 5 Viewpoint 5 Figure 29.17 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_06\n(Chapter 29)\nREP11-034\nLVIA GIS Addendum Appendix 6 Viewpoint 6 Figure 29.18 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_07\n(Chapter 29)\nREP11-035\nLVIA GIS Addendum Appendix 7 Viewpoint 8 Figure 29.20 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_08\n(Chapter 29)\nREP11-036\nLVIA GIS Addendum Appendix 8 Viewpoint 9 Figure 29.21 GIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_09\n(Chapter 29)\nREP11-037\nLVIA GIS Addendum Appendix 9 Viewpoint 1 Figure 29.13 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_10\n(Chapter 29)\nREP11-038\nLVIA GIS Addendum Appendix 10 Viewpoint 2 Figure 29.14 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_11\n(Chapter 29)\nREP11-039\nLVIA GIS Addendum Appendix 11 Viewpoint 3 Figure 29.15 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_12\n(Chapter 29)\nREP11-040\nLVIA GIS Addendum Appendix 12 Viewpoint 4 Figure 29.16 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_13\n(Chapter 29)\nREP11-041\nLVIA GIS Addendum Appendix 13 Viewpoint 5 Figure 29.17 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_14\n(Chapter 29)\nREP11-042\nLVIA GIS Addendum Appendix 14 Viewpoint 6 Figure 29.18 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_15\n(Chapter 29)\nREP11-043\nLVIA GIS Addendum Appendix 15 Viewpoint 8 Figure 29.20 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-4.D11.V1_16\n(Chapter 29)\nREP11-044\nLVIA GIS Addendum Appendix 16 Viewpoint 9 Figure 29.21 AIS Update\n1\nDeadline 11\n7th June 2021\nExA.AS-17.D1.V1\n(Chapter 30)\nREP1-036\n(APP-078)\nSocio-Economics and Tourism Clarification Note (SZC CIA)\n1\nDeadline 1\n2nd November 2020\nExA.WQ-1.A13.D1.V1\n(Chapter 30)\nREP1-102\n(APP-078)\nApplicants’ Responses to WQ1 Appendix 13 Tourism Impact Review\n1\nDeadline 1\n2nd November 2020\n5.3\nAPP-043\nHabitat Regulations Assessment - Information to Support the Appropriate Assessment Report\n1\n25th October 2019\n5.3.1\nAPP-044\nHabitat Regulations Assessment - Appendix 1 - Information to Support AA Report - HRA Screening Report\n1\n25th October 2019\n5.3.2\nREP3-016\nHabitat Regulations Assessment Appendix 2 – Information to Support AA Report – Screening Matrices\n3\nDeadline 3\n15th December 2020\n5.3.3\nAPP-046\nHabitat Regulations Assessment - Appendix 3 - Information to Support AA Report - Integrity Matrices\n1\n25th October 2019\nExA.AS-19.D1.V1\n(Chapter 11)\nREP1-038\n(APP-059)\nInformation to Support AA – Addendum for Marine Mammals\n1\nDeadline 1\n2nd November 2020\nExA.AS-7.D1.V1 (Information to Support Appropriate Assessment Report)\nREP1-047\n(APP-043 to APP-047)\nDeadline 1 Offshore Ornithology Cumulative and In Combination Collision Risk Update\n1\nDeadline 1\n2 November 2020\nExA.AS-7.D4.V1\n(Information to Support Appropriate Assessment Report)\nREP4-042\n(APP-043 to APP-047)\nDeadline 4 Offshore Ornithology Cumulative and In Combination Collision Risk Update\n1\nDeadline 4\n13th January 2021\nExA.AS-11.D8.V1\n(Information to Support Appropriate Assessment Report)\nREP8-035\n(APP-043 to APP-047)\nDeadline 8 Offshore Ornithology Cumulative and In Combination Collision Risk Update\n1\nDeadline 8\n25th March 2021\nExA.AS-3.D11.V1\n(Information to Support Appropriate Assessment Report)\nREP11-027\n(APP-043 to APP-047)\nDeadline 11 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update\n1\nDeadline 11\n7th June 2021\nExA.AS-8.D12.V1\n(Information to Support Appropriate Assessment Report)\nREP12-066\n(APP-043 to APP-047)\nDeadline 12 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update\n1\nDeadline 13\n15 July 2021\nExA.AS-12.D13.V1\n(Information to Support Appropriate Assessment Report)\nREP13-019\n(APP-043 to APP-047)\nDeadline 13 Offshore Ornithology Cumulative\nand In-Combination Collision Risk\nand Displacement Update\n1\nDeadline 13\n5th July 2021\nExA.AS-3.SoSQ.V1\n(Information to Support Appropriate Assessment Report)\n(APP-043 to APP-047)\nUpdated Offshore Ornithology\nCumulative and In-Combination\nCollision Risk and Displacement\nAssessment”\n1\nColumn (5) “30 November 2021”",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 17 Pt. 1 substituted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 17 Pt. 1 omitted (22.12.2022) by virtue of The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Word in Sch. 17 Pt. 1 inserted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Sch. 17 Pt. 1 inserted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Word in Sch. 17 Pt. 1 substituted (22.12.2022) by The East Anglia TWO Offshore Wind Farm (Correction) Order 2022 (S.I. 2022/1399), art. 1(2), Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 17 Pt. 1 in force at 22.4.2022, see art. 1(2)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/433/schedule/17/part/1",
    "retrieved_at": "2026-10-28T22:01:13.677247+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}