# The East Anglia TWO Offshore Wind Farm Order 2022, Part 1: Documents forming the environmental statement to be certified

Extent: E+W+S

(1)
(2)
(3)
(4)
(5)
Document Reference
(and relevant ES Chapters)
Examination Library Reference
(and relevant ES Chapter reference)
Document Name
Version
Date
6.1
APP-049 to APP-079
Environmental Statement
1
25th October 2019
6.2
APP-080 to APP-441
Figures
1
25th October 2019
6.3
APP-442 to APP-571
Technical Appendices
1
25th October 2019
ExA.WQ-1.A10.D1.V1
(Chapter 6)
REP1-099
(APP-054)
Applicants’ Responses to WQ1 Appendix 10 Landfall Indicative HDD Working Area
1
Deadline 1
2nd November 2020
ExA.WQ-1.A11.D1.V1
(Chapter 6)
REP1-100
(APP-054)
Applicants’ Responses to WQ1 Appendix 11 Landfall HDD Cross Sections
1
Deadline 1
2nd November 2020
ExA.AS-13.D6.V1
(Chapter 6)
REP6-024
(APP-054)
HDD Verification Clarification Note
1
Deadline 6
24th February 2021
ExA.WQ-1.A6.D1.V1
(Chapter 6)
REP1-090
(APP-054)
Applicants’ Responses to WQ1 Appendix 6 Illustrative Open Trench and Trenchless Onshore Cable Route
1
Deadline 1
2nd November 2020
ExA.WQ-1.A7.D1.V1
(Chapter 6)
REP1-091
(APP-054)
Applicants’ Responses to WQ1 Appendix 7 Onshore Crossing Schedule
1
Deadline 1
2nd November 2020
ExA.AS-10.D3.V1
(Chapter 6)
REP3-056
(APP-054)
Onshore Cable Route Works Programme Clarification Note
1
Deadline 3
15th December 2020
ExA.AS-11.D3.V1
(Chapter 6)
(Chapter 29)
REP3-057
(APP-054)
(APP-077)
Onshore Substations Update Clarification Note
1
Deadline 3
15th December 2020
ExA.AS-12.D3.V1
(Chapter 6)
REP3-058
(APP-054)
Construction in Proximity to Properties
1
Deadline 3
15th December 2020
6.3.6.2
(Chapter 6)
REP8-015
(APP-054)
EA2 Environmental Statement Appendix 6.2 Relationship of Onshore Plans Secured by the DCO
5
Deadline 8
25th March 2021
6.3.6.3
(Chapter 6)
REP8-016
(APP-054)
EA2 Environmental Statement Appendix 6.3 Relationship of Offshore Plans Secured by the DCO
5
Deadline 8
25th March 2021
6.3.6.4
(Chapter 6)
REP3-020
(APP-054)
EA2 Environmental Statement Appendix 6.4 Cumulative Project Description
2
Deadline 3
15th December 2020
ExA.RRA6.D0.V1
(Chapters 7 to 17)
AS-043
(APP-055 to APP-065)
Applicant’s Comments on Relevant Representations ... Appendix 6 Disposal Site Locations (Windfarm Site)
1
11th June 2020
ExA.RRA2.D0.V1
(Chapter 7)
AS-039
(APP-055)
Applicant’s Comments on Relevant Representations ... Appendix 2 Wave Climatology Clarification Note
1
11th June 2020
ExA.AS-13.D3.V1
(Chapter 7)
(Chapter 9)
(Chapter 10)
(Chapter 12)
REP3-059
(APP-055)
(APP-057)
(APP-058)
(APP-060)
Effects on Supporting Habitats of Outer Thames Estuary SPA Clarification Note
1
Deadline 3
15th December 2020
ExA.RRA3.D0.V1
(Chapter 10)
AS-040
(APP-058)
Applicant’s Comments on Relevant Representations ... Appendix 3 Fish and Shellfish Ecology Clarification Note
1
11th June 2020
ExA.AS-5.D11.V2
(Chapter 11)
REP11-045
(APP-059)
Underwater Noise Modelling Report Update
2
Deadline 11
7th June 2021
ExA.AS-3.D2.V1
(Chapter 12)
REP2-006
(APP-060)
Cumulative Auk Displacement and Seabird Assemblage Assessment of FFC SPA and Gannet PVA
1
Deadline 2
17th November 2020
ExA.AS-2.D11.V5 (Chapter 12)
REP11-026
(APP-060)
Displacement of red-throated divers in the Outer Thames Estuary SPA
5
Deadline 11
7th June 2021
ExA.AS-20.D1.V1
(Chapter 19)
(Chapter 26)
REP1-040
(APP-067)
(APP-074)
Deadline 1 Air Quality Clarification Note
1
Deadline 1
2nd November 2020
ExA.AS-16.D3.V1
(Chapter 19)
REP3-061
(APP-067)
Deadline 3 Air Quality Clarification Note
1
Deadline 3
15th December 2020
ExA.WQ-1.A8.D1.V1
(Chapter 20)
REP1-092
(APP-068)
Applicants’ Responses to WQ1 Appendix 8 Environment Agency Flood Zones
1
Deadline 1
2nd November 2020
ExA.AS-9.D4.V2
(Chapter 20)
REP4-044
(APP-068)
Clarification Note SuDS Infiltration Note
2
Deadline 4
13th January 2021
ExA.AS-12.D6.V1
(Chapter 18)
(Chapter 20)
REP6-021
(APP-066)
(APP-068)
Landfall Hydrogeological Risk Assessment
1
Deadline 6
24th February 2021
ExA.AS-13.D8.V1
(Chapter 20)
REP8-038
(APP-068)
Flood Risk and Drainage Clarification Note
1
Deadline 8
25th March 2021
ExA.AS-11.D1.V1
(Chapter 21)
REP1-022
(APP-069)
Land Use Clarification Note
1
Deadline 1
2nd November 2020
ExA.WQ-1.A4.D1.V1
(Chapter 22)
REP1-088
(APP-070)
Applicants’ Responses to WQ1 Appendix 4 Ecological Mitigation Works
1
Deadline 1
2nd November 2020
ExA.AS-12.D1.V1
(Chapter 22)
REP1-023
(APP-070)
Onshore Ecology Clarification Note
1
Deadline 1
2nd November 2020
ExA.AS-16.D1.V1
(Chapter 22)
REP1-035
(APP-070)
Ecological Enhancement Clarification Note
1
Deadline 1
2nd November 2020
ExA.AS-14.D3.V1
(Chapter 22)
REP3-060
(APP-070)
Deadline 3 Onshore Ecology Clarification Note
1
Deadline 3
15th December 2020
ExA.AS-10.D4.V1
(Chapter 22)
REP4-005
(APP-070)
Deadline 4 Onshore Ecology Clarification Note
1
Deadline 4
13th January 2021
ExA.AS-14.D6.V1
(Chapter 22)
REP6-025
(APP-070)
Deadline 6 Onshore Ecology Clarification Note
1
Deadline 6
24th February 2021
ExA.AS-28.D6.V1
(Chapter 22)
REP6-035
(APP-070)
Ecology Survey Results: February 2021
1
Deadline 6
24th February 2021
ExA.AS-16.D8.V1
(Chapter 22)
REP8-041
(APP-070)
Ecological Enhancement Clarification Note Addendum
1
Deadline 8
25th March 2021
ExA.AS-10.D1.V1
(Chapter 24)
(Chapter 29)
REP1-021
(APP-072)
(APP-077)
Archaeology and Cultural Heritage Clarification Note
1
Deadline 1
2nd November 2020
ExA.AS-13.D1.V1
(Chapter 24)
REP1-024
(APP-072)
Pre-Construction Trial Trenching Report
1
Deadline 1
2nd November 2020
ExA.AS-14.D1.V1
(Chapter 24)
REP1-025 to REP1-033
(APP-072)
Onshore Archaeology Geophysical Survey Report (Parts 1 to 9)
1
Deadline 1
2nd November 2020
ExA.AS-15.D1.V1
(Chapter 24)
REP1-034
(APP-072)
Onshore Archaeology Earthworks Report
1
Deadline 1
2nd November 2020
ExA.AS-29.D8.V1
(Chapter 24)
REP8-063
(APP-072)
Cultural heritage Viewpoint 5 Additional Visualisation
1
Deadline 8
25th March 2021
ExA.AS-16.D3.V1
(Chapter 24) (Chapter 29)
REP3-062 to REP3-068
(APP-072)
(APP-077)
Updated Photomontages Clarification Note
1
Deadline 3
15th December 2020
ExA.AS-11.D4.V1
(Chapter 24)
REP4-006
(APP-072)
Heritage Assessment Addendum
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_001
(Chapter 24)
REP4-007
(APP-072)
Heritage Assessment Addendum Appendix 1 CHVP2 –PRoW between Friston Hall and Friston (Appendix 24.7, Figure 7 Update)
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_002
(Chapter 24)
REP4-008
(APP-072)
Heritage Assessment Addendum Appendix 2 CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8 Update)
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_003
(Chapter 24)
REP4-009
(APP-072)
Heritage Assessment Addendum Appendix 3 CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9 Update)
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_004
(Chapter 24)
REP4-010
(APP-072)
Heritage Assessment Addendum Appendix 4 CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10 Update)
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_005
(Chapter 24)
REP4-011
(APP-072)
Heritage Assessment Addendum Appendix 5 CHVP7 – Friston House (b) (Appendix 24.7, Figure 12 Update)
1
Deadline 4
13th January 2021
ExA.AS-11.D4.V1_006
(Chapter 24)
REP4-012
(APP-072)
Heritage Assessment Addendum Appendix 6 CHVP8 – Friston War Memorial (Appendix 24.7, Figure 13 Update)
1
Deadline 4
13th January 2021
ExA.AS-30.D11.V1
(Chapter 24)
REP11-075
Heritage Assessment GIS Addendum
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_01
(Chapter 24)
REP11-076
Heritage Assessment GIS Addendum App 1 CHVP2 App 24.7 Fig 7 Update
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_02
(Chapter 24)
REP11-077
Heritage Assessment GIS Addendum App 2 CHVP3 App 24.7 Fig 8 Update
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_03
(Chapter 24)
REP11-078
Heritage Assessment GIS Addendum App 3 CHVP4 App 24.7 Fig 9 Update
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_04 (Chapter 24)
REP11-054
Heritage Assessment GIS Addendum App 4 CHVP5 App 24.7 Fig 10 Update
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_05
(Chapter 24)
REP11-079
Heritage Assessment GIS Addendum App 5 CHVP7 App 24.7 Fig 12 Update
1
Deadline 11
7th June 2021
ExA.AS-30.D11.V1_06
(Chapter 24)
REP11-080
Heritage Assessment GIS Addendum App 6 CHVP8 App 24.7 Fig 13
1
Deadline 11
7th June 2021
ExA.AS-14.D8.V1
(Chapter 25)
REP8-039
(APP-073)
Applicants’ Position Statement on Noise
1
Deadline 8
25th March 2021
ExA.AS-8.D2.V1
(Chapter 25)
REP2-011
(APP-073)
Noise and Vibration Assessment Clarification Note
1
Deadline 2
17th November 2020
ExA.AS-8.D4.V1
(Chapter 25)
REP4-043
(APP-073)
Noise Modelling Clarification Note
1
Deadline 4
13th January 2021
ExA.WQ-1.A14.D1.V1
(Chapter 26)
REP1-103
(APP-074)
Applicants’ Responses to WQ1 Appendix 14 Junction Locations
1
Deadline 1
2nd November 2020
ExA.AS-8.D1.V1 (Chapter 26)
REP1-048
(APP-074)
Traffic and Transport Clarification Note for Deadline 1
1
Deadline 1
2nd November 2020
ExA.AS-6.D6.V2
(Chapter 26)
REP6-043
(APP-074)
Sizewell C Cumulative Impact Assessment Note (Traffic and Transport)
2
Deadline 6
24th February 2021
ExA.AS-9.D3.V1
(Chapter 26)
REP3-055
(APP-074)
Traffic and Transport Clarification Note for Deadline 3
1
Deadline 3
15th December 2020
ExA.AS-26.D4.V1
(Chapter 26)
REP4-027
(APP-074)
Traffic and Transport Deadline 4 Clarification Note
1
Deadline 4
13th January 2021
ExA.AS-9.D1.V1
(Chapters 27 to 30)
REP1-049
(APP-075 to APP-078)
Public Rights of Way Clarification Note
1
Deadline 1
2nd November 2020
ExA.AS-5.D2.V1
(Chapter 28)
(Chapter 29)
REP2-008
(APP-076)
(APP-077)
Effects with Regard to the Statutory Purposes of the Suffolk Coast and Heaths Area of Outstanding Natural Beauty and Accordance with NPS Policy
1
Deadline 2
17th November 2020
ExA.AS-33.D8.V1
(Chapter 28)
REP8-075
(APP-076)
Landscape and Visual: Sizewell C Cumulative Impact Assessment
1
Deadline 8
25th March 2021
ExA.WQ-1.A9.7.D1.V1
(Chapter 29)
REP1-093
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.7 EA2 Annotated Viewpoint 1
1
Deadline 1
2nd November 2020
ExA.WQ-1.A9.8.D1.V1
(Chapter 29)
REP1-094
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.8 EA2 Annotated Viewpoint 2
1
Deadline 1
2nd November 2020
ExA.WQ-1.A9.9.D1.V1
(Chapter 29)
REP1-095
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.9 EA2 Annotated Viewpoint 3
1
Deadline 1
2nd November 2020
ExA.WQ-1.A9.10.D1.V1
(Chapter 29)
REP1-096
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.10 EA2 Annotated Viewpoint 4
1
Deadline 1
2nd November 2020
ExA.WQ-1.A9.11.D1.V1
(Chapter 29)
REP1-097
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.11 EA2 Annotated Viewpoint 5
1
Deadline 1
2nd November 2020
ExA.WQ-1.A9.12.D1.V1
(Chapter 29)
REP1-098
(APP-077)
Applicants’ Responses to WQ1 Appendix 9.12 EA2 Annotated Viewpoint 8
1
Deadline 1
2nd November 2020
ExA.AS-7.D2.V1
(Chapter 29)
REP2-010
(APP-077)
Sizewell C Cumulative Impact Assessment Note (Landscape and Visual)
1
Deadline 2
17th November 2020
ExA.AS-3.D4.V1
(Chapter 29)
REP4-031
(APP-077)
Landscape and Visual Impact Assessment Addendum
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_001
(Chapter 29)
REP4-032
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 1 Viewpoint 1 – Public Right of Way (PRoW) near Friston House (Figure 29.13 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_002
(Chapter 29)
REP4-033
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 2 Viewpoint 2 – Friston, Church Road (Figure 29.14 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_003
(Chapter 29)
REP4-034
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 3 Viewpoint 3 – Grove Road, near Pear Tree Farm (Figure 29.15 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_004
(Chapter 29)
REP4-035
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 4 Viewpoint 4 – Grove Road, near Church Road (Friston) (Figure 29.16 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_005
(Chapter 29)
REP4-036
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 5 Viewpoint 5 – PRoW near Moor Farm (Figure 29.17 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_006
(Chapter 29)
REP4-037
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 6 Viewpoint 6 – Friston, Village Green (Figure 29.18 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_007
(Chapter 29)
REP4-038
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 7 Viewpoint 8 – Saxmundham Road (North of Friston) (Figure 29.20 Update)
1
Deadline 4
13th January 2021
ExA.AS-3.D4.V1_008
(Chapter 29)
REP4-039
(APP-077)
Landscape and Visual Impact Assessment Addendum Appendix 8 Viewpoint 9 – B1121 Aldeburgh Road, south of Friston (Figure 29.21 Update)
1
Deadline 4
13th January 2021
ExA.AS-6.D7.V1
(Chapter 29)
REP7-062
(APP-077)
Updated Figure 29.37- Viewpoint 5 Public Rights of Way, near Moor Farm (with National Grid GIS Substation)
1
Deadline 7
4th March 2021
ExA.AS-28.D8.V1_01
(Chapter 29)
REP8-055
(APP-077)
National Grid GIS Substation Photomontages: Figure 29.13 Update Viewpoint 1 Public Rights of Way near Friston House
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_02
(Chapter 29)
REP8-056
(APP-077)
National Grid GIS Substation Photomontages: Figure 29.14 Update Viewpoint 2 Friston, Church Road
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_03
(Chapter 29)
REP8-057
(APP-077)
National Grid GIS Substation Photomontages: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_04
(Chapter 29)
REP8-058
(APP-077)
National Grid GIS Substation Photomontages: Figure 29.20 Update
Viewpoint 8 Saxmundham Road (North of Friston)
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_05
(Chapter 29)
REP8-059
(APP-077)
National Grid GIS Substation Photomontages: Figure 29.21 Update Viewpoint 9: B1121 Aldeburgh Road (south of Friston)
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_06
(Chapter 29)
REP8-060
(APP-077)
National Grid GIS Substation Photomontages: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update)
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_07
(Chapter 29)
REP8-061
(APP-077)
National Grid GIS Substation Photomontages: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update)
1
Deadline 8
25th March 2021
ExA.AS-28.D8.V1_08
(Chapter 29)
REP8-062
(APP-077)
National Grid GIS Substation Photomontages: CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10-Update)
1
Deadline 8
25th March 2021
ExA.AS-30.D8.V1_01
(Chapter 29)
REP8-066
(APP-077)
Different colour schemes for Substations Design Principles Statement : Viewpoint 1 Public Rights of Way near Friston House
1
Deadline 8
25th March 2021
ExA.AS-30.D8.V1_02
(Chapter 29)
REP8-067
(APP-077)
Different colour schemes for Substations Design Principles Statement: Viewpoint 2 Friston, Church Road
1
Deadline 8
25th March 2021
ExA.AS-30.D8.V1_03
(Chapter 29)
REP8-068
(APP-077)
Different colour schemes for Substations Design Principles Statement: Viewpoint 9 – B1121 Aldeburgh Road, south of Friston
1
Deadline 8
25th March 2021
ExA.AS-31.D8.V1_01
(Chapter 29)
REP8-071
(APP-077)
Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.14 Update Viewpoint 2 Friston, Church Road
1
Deadline 8
25th March 2021
ExA.AS-31.D8.V1_02
(Chapter 29)
REP8-072
(APP-077)
Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm
1
Deadline 8
25th March 2021
ExA.AS-31.D8.V1_03
(Chapter 29)
REP8-073
(APP-077)
Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston)
1
Deadline 8
25th March 2021
ExA.AS-31.D8.V1_04
(Chapter 29)
REP8-069
(APP-077)
Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update)
1
Deadline 8
25th March 2021
ExA.AS-31.D8.V1_05
(Chapter 29)
REP8-070
(APP-077)
Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update)
1
Deadline 8
25th March 2021
ExA.AS-32.D8.V1
(Chapter 29)
REP8-074
(APP-077)
Extension of National Grid Substation Appraisal
1
Deadline 8
25th March 2021
ExA.AS-4.D11.V1
(Chapter 29)
REP11-028
Landscape and Visual Impact Assessment GIS Addendum
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_01
(Chapter 29)
REP11-029
LVIA GIS Addendum Appendix 1 Viewpoint 1 Figure 29.13 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_02
(Chapter 29)
REP11-030
LVIA GIS Addendum Appendix 2 Viewpoint 2 Figure 29.14 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_03
(Chapter 29)
REP11-031
LVIA GIS Addendum Appendix 3 Viewpoint 3 Figure 29.15 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_04
(Chapter 29)
REP11-032
LVIA GIS Addendum Appendix 4 Viewpoint 4 Figure 29.16 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_05
(Chapter 29)
REP11-033
LVIA GIS Addendum Appendix 5 Viewpoint 5 Figure 29.17 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_06
(Chapter 29)
REP11-034
LVIA GIS Addendum Appendix 6 Viewpoint 6 Figure 29.18 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_07
(Chapter 29)
REP11-035
LVIA GIS Addendum Appendix 7 Viewpoint 8 Figure 29.20 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_08
(Chapter 29)
REP11-036
LVIA GIS Addendum Appendix 8 Viewpoint 9 Figure 29.21 GIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_09
(Chapter 29)
REP11-037
LVIA GIS Addendum Appendix 9 Viewpoint 1 Figure 29.13 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_10
(Chapter 29)
REP11-038
LVIA GIS Addendum Appendix 10 Viewpoint 2 Figure 29.14 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_11
(Chapter 29)
REP11-039
LVIA GIS Addendum Appendix 11 Viewpoint 3 Figure 29.15 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_12
(Chapter 29)
REP11-040
LVIA GIS Addendum Appendix 12 Viewpoint 4 Figure 29.16 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_13
(Chapter 29)
REP11-041
LVIA GIS Addendum Appendix 13 Viewpoint 5 Figure 29.17 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_14
(Chapter 29)
REP11-042
LVIA GIS Addendum Appendix 14 Viewpoint 6 Figure 29.18 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_15
(Chapter 29)
REP11-043
LVIA GIS Addendum Appendix 15 Viewpoint 8 Figure 29.20 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-4.D11.V1_16
(Chapter 29)
REP11-044
LVIA GIS Addendum Appendix 16 Viewpoint 9 Figure 29.21 AIS Update
1
Deadline 11
7th June 2021
ExA.AS-17.D1.V1
(Chapter 30)
REP1-036
(APP-078)
Socio-Economics and Tourism Clarification Note (SZC CIA)
1
Deadline 1
2nd November 2020
ExA.WQ-1.A13.D1.V1
(Chapter 30)
REP1-102
(APP-078)
Applicants’ Responses to WQ1 Appendix 13 Tourism Impact Review
1
Deadline 1
2nd November 2020
5.3
APP-043
Habitat Regulations Assessment - Information to Support the Appropriate Assessment Report
1
25th October 2019
5.3.1
APP-044
Habitat Regulations Assessment - Appendix 1 - Information to Support AA Report - HRA Screening Report
1
25th October 2019
5.3.2
REP3-016
Habitat Regulations Assessment Appendix 2 – Information to Support AA Report – Screening Matrices
3
Deadline 3
15th December 2020
5.3.3
APP-046
Habitat Regulations Assessment - Appendix 3 - Information to Support AA Report - Integrity Matrices
1
25th October 2019
ExA.AS-19.D1.V1
(Chapter 11)
REP1-038
(APP-059)
Information to Support AA – Addendum for Marine Mammals
1
Deadline 1
2nd November 2020
ExA.AS-7.D1.V1 (Information to Support Appropriate Assessment Report)
REP1-047
(APP-043 to APP-047)
Deadline 1 Offshore Ornithology Cumulative and In Combination Collision Risk Update
1
Deadline 1
2 November 2020
ExA.AS-7.D4.V1
(Information to Support Appropriate Assessment Report)
REP4-042
(APP-043 to APP-047)
Deadline 4 Offshore Ornithology Cumulative and In Combination Collision Risk Update
1
Deadline 4
13th January 2021
ExA.AS-11.D8.V1
(Information to Support Appropriate Assessment Report)
REP8-035
(APP-043 to APP-047)
Deadline 8 Offshore Ornithology Cumulative and In Combination Collision Risk Update
1
Deadline 8
25th March 2021
ExA.AS-3.D11.V1
(Information to Support Appropriate Assessment Report)
REP11-027
(APP-043 to APP-047)
Deadline 11 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update
1
Deadline 11
7th June 2021
ExA.AS-8.D12.V1
(Information to Support Appropriate Assessment Report)
REP12-066
(APP-043 to APP-047)
Deadline 12 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update
1
Deadline 13
15 July 2021
ExA.AS-12.D13.V1
(Information to Support Appropriate Assessment Report)
REP13-019
(APP-043 to APP-047)
Deadline 13 Offshore Ornithology Cumulative
and In-Combination Collision Risk
and Displacement Update
1
Deadline 13
5th July 2021
ExA.AS-3.SoSQ.V1
(Information to Support Appropriate Assessment Report)
(APP-043 to APP-047)
Updated Offshore Ornithology
Cumulative and In-Combination
Collision Risk and Displacement
Assessment”
1
Column (5) “30 November 2021”

---
Source: https://www.legislation.gov.uk/uksi/2022/433/schedule/17/part/1 (the official version)
Page: https://openlegislation.uk/east-anglia-two-offshore-wind-farm-order-2022/schedule-17/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.