# The East Midlands Gateway Rail Freight Interchange and Highway Order 2016, Article 10: Highway works

Extent: E+W+S

(1) The undertaker may for the purposes of the carrying out of the highway works, enter on so much of any of the streets specified in Schedule 3 (streets subject to highway works) as is within the Order limits and may—
(a) break up or open the street, or any sewer, drain or tunnel under it;
(b) tunnel or bore under the street;
(c) place apparatus in the street;
(d) maintain apparatus in the street or change its position;
(e) construct bridges and tunnels;
(f) increase the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street;
(g) alter the level or increase the width of such kerb, footway, cycle track or verge;
(h) reduce the width of the carriageway of the street;
(i) make and maintain crossovers and passing places; and
(j) execute any works required for or incidental to any works referred to in sub-paragraphs (a) to (i).
(2) The highway works must be carried out in accordance with the relevant provisions of Schedules 19 and 20 (protection of interests).

---
Source: https://www.legislation.gov.uk/uksi/2016/17/article/10 (the official version)
Page: https://openlegislation.uk/east-midlands-gateway-rail-freight-interchange-and-highway-order-2016/article-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.