# The East Midlands Gateway Rail Freight Interchange and Highway Order 2016, Part 2: NO WAITING AT ANY TIME

Extent: E+W+S

(1)
Location
(2)
Length
(3)
Event
Lockington local access road
Between points xiii and xiv along the centreline shown orange on the traffic regulation plans (Document 2.6A).
Opening to traffic of the length of road described in columns (1) and (2).
Church Street
(i) Between points xv, xvi and xvii along the centreline shown orange on the traffic regulation plans (Document 2.6A); and
(ii) Between points xvi and xvii along the centreline shown orange on the traffic regulation plans (Document 2.6A).
Opening to traffic of the length of road described in columns (1) and (2).
C8211
(i) Between points xix, xx and xxi along the centreline shown orange on the traffic regulation plans (Document 2.6B).
(ii)Between points xx and xxii along the centreline shown orange on the traffic regulation plans (Document 2.6B).
Opening of the new road shown coloured green between points 37-38 as shown on the highway classifications plans (Document 2.5B).

---
Source: https://www.legislation.gov.uk/uksi/2016/17/schedule/10/part/2 (the official version)
Page: https://openlegislation.uk/east-midlands-gateway-rail-freight-interchange-and-highway-order-2016/schedule-10/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

