# The East Midlands Gateway Rail Freight Interchange and Highway Order 2016, Paragraph 6: Detailed design approval

Extent: E+W+S

(1) The details of each phase of the authorised development (with the exception of the highway works which are governed by requirements 4 and 5 and Schedules 19 and 20 (protection of interests)) must be in accordance with the design and access statement (Document 6.9). The design and access statement can be reviewed and updated by the undertaker in agreement with the local planning authority.
(2) The details of each phase must include details of the following where they are located within that phase—
(a) rail infrastructure;
(b) embankments and bunds;
(c) vehicular circulation routes;
(d) hard landscaping, cycle tracks, footpaths and bridleways;
(e) surface and foul drainage;
(f) bicycle, motorcycle and vehicle parking;
(g) built development design (including external materials and sustainable energy measures) and layout;
(h) site levels and finished floor levels;
(i) roads within the main site;
(j) intermodal area;
(k) fuelling and maintenance areas;
(l) freight storage area (including containers);
(m) weighbridges;
(n) gatehouses;
(o) fencing walls and other means of enclosure (including acoustic fencing);
(p) substations;
(q) public transport infrastructure; and
(r) footpath specification.

---
Source: https://www.legislation.gov.uk/uksi/2016/17/schedule/2/paragraph/6 (the official version)