Paragraph 1 Interpretation
In this Schedule—
-
“archaeological mitigation strategy” means the strategy at Appendix DEC A of the DEC;
-
“boundary design principles” means the principles set out in Appendix DEC B of the DEC;
-
“dust management scheme” means the scheme at Appendix DEC H of the DEC;
-
“ecological management, monitoring and aftercare plan” means the plan at Appendix DEC E of the DEC;
-
“new works” means Work Nos. 1B, 4 and 5 for which development has not yet commenced at the date this Order takes effect;
-
“noise and vibration management plan” means the plan at Appendix DEC L of the DEC;
-
“operational site” means Work Nos. 1A, 2 and 3 which are consented under the original order.
-
“phase” means the relevant phase referred to in the phasing sequence table;
-
“phasing sequence table” means the table in Appendix DEC D of the DEC;
-
“relevant parameters” means the parameters set out in Schedule 4 and in Appendix DEC C of the DEC;
-
“soil handling and management scheme” means the scheme at Appendix DEC I of the DEC;
-
“stockpile management scheme” means the scheme at Appendix DEC J of the DEC;
-
“surface water management plan” means the plan at Appendix DEC F of the DEC;
-
“traffic management plan” means the plan at Appendix DEC K of the DEC.