In this Schedule—

  • “archaeological mitigation strategy” means the strategy at Appendix DEC A of the DEC;

  • “boundary design principles” means the principles set out in Appendix DEC B of the DEC;

  • “dust management scheme” means the scheme at Appendix DEC H of the DEC;

  • “ecological management, monitoring and aftercare plan” means the plan at Appendix DEC E of the DEC;

  • “new works” means Work Nos. 1B, 4 and 5 for which development has not yet commenced at the date this Order takes effect;

  • “noise and vibration management plan” means the plan at Appendix DEC L of the DEC;

  • “operational site” means Work Nos. 1A, 2 and 3 which are consented under the original order.

  • “phase” means the relevant phase referred to in the phasing sequence table;

  • “phasing sequence table” means the table in Appendix DEC D of the DEC;

  • “relevant parameters” means the parameters set out in Schedule 4 and in Appendix DEC C of the DEC;

  • “soil handling and management scheme” means the scheme at Appendix DEC I of the DEC;

  • “stockpile management scheme” means the scheme at Appendix DEC J of the DEC;

  • “surface water management plan” means the plan at Appendix DEC F of the DEC;

  • “traffic management plan” means the plan at Appendix DEC K of the DEC.