# The East Yorkshire Solar Farm Order 2025, Article 3: Development consent etc. granted by this Order

Extent: E+W

(1) Subject to the provisions of this Order and the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development in Schedule 1 (authorised development) to be carried out within the Order limits.
(2) Each numbered work must be situated within the corresponding numbered area shown on the works plans.

---
Source: https://www.legislation.gov.uk/uksi/2025/585/article/3 (the official version)