# The East Yorkshire Solar Farm Order 2025, Paragraph 1: Interpretation

Extent: E+W

In this Schedule—
“access rights” means rights over land to—
alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays, bridges and road widening and to remove impediments (including vegetation) to such access;
remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary;
install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works;
restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts.
“cable rights” means rights over land to—
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other ancillary apparatus and structures (including but not limited to access chambers, manholes and marker posts) and any other works necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus;
remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development;
continuous vertical and lateral support for the authorised development;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts;
install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary; and
restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.
(1)
Plot reference number shown on the Land Plans
(2)
Purposes for which rights over land may be required and restrictive covenants imposed
1/01Access rights
1/03Access rights
1/04Access rights
2/05Access rights
3/10Cable rights
4/13Cable rights
4/14Cable rights
4/21Cable rights
4/22Cable rights
4/23Cable rights
4/24Cable rights
4/25Cable rights
4/27Cable rights
4/28Cable rights
6/34Cable rights
6/35Cable rights
6/36Cable rights
6/37Cable rights
9/40Cable rights
10/43Access rights
10/44Cable rights
10/45Cable rights
10/46Access rights
11/49Cable rights
12/52Access rights
4/53Cable rights
9/54Cable rights
9/55Cable rights
9/56Cable rights
9/57Cable rights
13/60Cable rights
8/61Cable rights
9/62Cable rights
8/63Cable rights
8/64Access rights
8/66Cable rights
14/68Cable rights
14/72Cable rights
14/75Cable rights
14/76Cable rights
14/77Cable rights
14/78Cable rights
15/81Cable rights
15/83Cable rights
16/87Cable rights
16/89Cable rights
16/90Cable rights
16/91Access rights
15/92Cable rights
15/93Cable rights
15/94Cable rights
18/95Cable rights
18/96Cable rights
18/97Cable rights
18/98Cable rights
18/99Cable rights
18/100Cable rights
18/101Cable rights
18/102Cable rights
18/103Cable rights
18/104Cable rights
18/105Cable rights
18/106Cable rights
18/107Cable rights
18/108Cable rights
18/109Cable rights
18/110Cable rights
19/111Cable rights
19/112Cable rights
19/113Cable rights
19/114Cable rights
19/115Cable rights
19/116Cable rights
19/117Cable rights
19/118Cable rights
19/119Cable rights
19/120Cable rights
19/121Access rights
19/122Cable rights
19/123Cable rights
19/124Cable rights
19/125Cable rights
19/126Cable rights
19/127Cable rights
19/128Cable rights
19/129Cable rights
20/130Cable rights
20/131Cable rights
20/132Cable rights
20/133Cable rights
20/134Cable rights
20/135Cable rights
20/136Cable rights
20/137Cable rights
20/138Cable rights
21/139Cable rights
21/140Cable rights
21/141Cable rights
21/142Cable rights
21/143Cable rights
21/144Cable rights
21/145Cable rights
21/146Cable rights
21/147Cable rights
21/148Cable rights
21/149Cable rights
21/150Cable rights
22/151Cable rights
21/152Cable rights
21/153Cable rights
22/154Cable rights
22/155Cable rights
22/156Cable rights
22/157Cable rights
22/158Access rights
22/159Access rights
22/160Access rights
22/161Access rights
22/162Access rights
22/163Access rights
22/164Cable rights
22/165Cable rights
22/166Cable rights
22/167Cable rights
22/168Cable rights
22/169Cable rights
22/170Cable rights
22/171Cable rights
22/172Cable rights
22/173Access rights

---
Source: https://www.legislation.gov.uk/uksi/2025/585/schedule/9/paragraph/1 (the official version)
Page: https://openlegislation.uk/east-yorkshire-solar-farm-order-2025/schedule-9/paragraph-1/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

