# The Ecodesign for Energy-Related Products and Energy Information (Household Tumble Dryers) Regulations 2026, Paragraph 13


The manufacturer, importer or authorised representative must accept or refuse a request referred to in paragraph 10 before the end of the period of 5 working days beginning with the day after the day on which the request was made and, if accepted, the professional repairer must have access to the information before the end of the first working day after the day on which the request was accepted; the information may be provided for an equivalent model or model of the same family, where relevant.

---
Source: https://www.legislation.gov.uk/uksi/2026/318/schedule/2/paragraph/13 (the official version)
Page: https://openlegislation.uk/ecodesign-for-energy-related-products-and-energy-information-household-tumble-dryers-regulations-2026/schedule-2/paragraph-13/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

