# The Edinburgh Tram (Line One) Act 2006 (Extension of Time for Land Acquisition) Order 2011, Article 2: Extension of time period in section 40(1) of the Edinburgh Tram (Line One) Act 2006


The period referred to in section 40(1) of the Edinburgh Tram (Line One) Act 2006 is extended until 7th May 2016.

---