Article 2 Extension of time period in section 40(1) of the Edinburgh Tram (Line Two) Act 2006
The period referred to in section 40(1) of the Edinburgh Tram (Line Two) Act 2006 is extended until 26th April 2021.
The period referred to in section 40(1) of the Edinburgh Tram (Line Two) Act 2006 is extended until 26th April 2021.