# The Eggborough Gas Fired Generating Station (Correction) Order 2018, Article 2: Corrections


(1) The Eggborough Gas Fired Generating Station Order 2018 is corrected as set out in the table in the Schedule to this Order, where—
(a) column 1 sets out where the correction is to be made;
(b) column 2 sets out how the correction is to be made; and
(c) column 3 sets out the text which is to be substituted, inserted or omitted.

---