# The Eggborough Gas Fired Generating Station Order 2018, Paragraph 1


(1) In this licence—
“the 2008 Act” means the Planning Act 2008;
“the 2009 Act” means the Marine and Coastal Access Act 2009;
“authorised development” means the development described in Part 1 of Schedule 1 and any other development authorised by the Order that is development within the meaning of section 32 of the 2008 Act;
“authorised project” means the authorised development;
“the English inshore region” has the same meaning as that given in section 322 (interpretation) of the 2009 Act;
“licence holder” means the undertaker and any agent, contractor or sub-contractor acting on its behalf;
“licensable marine activities” means any activity licensable under section 66 of the 2009 Act;
“licensed activity” means any activity described in Part 2 of this licence;
“maintain” includes inspect, repair, adjust, alter, remove, refurbish, reconstruct, replace and improve to the extent that such activities have been assessed in the environmental statement and “maintenance” and “maintaining” are to be construed accordingly;
“mean high water spring tide” means the highest level which spring tides reach on average over a period of time;
“MMO” means the Marine Management Organisation;
“river” means for the purposes of this Schedule 13 the areas of Work No. 4 which are below mean high water spring tide within the River Aire;
“Order” means The Eggborough Gas Fired Generating Station Order 2018;
“Order land” means the land delineated and marked as such on the land plans;
“the Order limits” means the limits shown on the works plans within which the authorised development may be carried out;
“undertaker” means Eggborough Power Limited (registered company number 03782700);
“Work No. 4” means cooling water connection works, comprising works to the existing cooling water supply and discharge pipelines and intake and outfall structures, including, as necessary, new, upgraded or replacement pipelines, plant, buildings, enclosures and structures, and underground electrical supply cables, transformers and control systems cables,

---
Source: https://www.legislation.gov.uk/uksi/2018/1020/schedule/13/paragraph/1 (the official version)
Page: https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018/schedule-13/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.