# The Eggborough Gas Fired Generating Station Order 2018, Paragraph 3


(1) Subject to the licence conditions in Part 3 of this licence, this licence authorises the licence holder to carry out any licensable marine activities under section 66(1) of the 2009 Act which—
(a) form part of, or are related to, the authorised project; and
(b) are not exempt from requiring a marine licence by virtue of any provision made under section 74 of the 2009 Act.
(2) Such activities are authorised in relation to the construction, maintenance and operation of—
(a) Work No. 4 — works including the installation and removal of a cofferdam and works to the existing cooling water discharge structure, including, as necessary, upgraded or replacement pipelines and structures.
(3) The activity set out in sub-paragraph (2)(a) is authorised in relation to the construction, maintenance and operation of those elements of Work No. 4 of Schedule 1 (authorised development) of this Order as defined in paragraph 1 of this schedule, and any further associated development listed in items (a) to (m) in Schedule 1 in connection with Work No. 4, which fall within the English inshore region.
(4) The undertaker (and any agent, contractor or subcontractor acting on its behalf) may engage in the licensed activities in—
(a) the area bounded by the coordinates set out in Table 12 in this paragraph; and
(b) if there is a change in mean high water springs during the construction, maintenance and operation of the licensed activities, the area bounded by the coordinates set out in Table 13 in this paragraph to the extent that they fall below mean high water spring tide at the time the licensed activities are carried out.
(5) The coordinates in Table 12 and Table 13 are defined in accordance with reference system WGS84 –World Geodetic System 1984.
Table 12
Work No.
Easting
Northing
4
624397.000
5953948.000
624393.000
5953940.000
624387.000
5953937.000
624378.000
5953936.000
624368.000
5953936.000
624363.000
5953938.000
624355.000
5953938.000
624347.000
5953943.000
624345.000
5953943.000
624342.000
5953946.000
624335.000
5953951.000
624326.000
5953957.000
624318.000
5953963.000
624327.000
5953980.000
Table 13
Work No.
Easting
Northing
4
624397.000
5953948.000
624384.000
5953924.000
624312.000
5953951.000
624326.000
5953979.000

---
Source: https://www.legislation.gov.uk/uksi/2018/1020/schedule/13/paragraph/3 (the official version)
Page: https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018/schedule-13/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.