{
  "url": "https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018/schedule-14/paragraph-3",
  "json_url": "https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018/schedule-14/paragraph-3.json",
  "legislation": "uksi/2018/1020",
  "legislation_title": "The Eggborough Gas Fired Generating Station Order 2018",
  "legislation_url": "https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018",
  "path": "schedule/14/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": null,
  "text": "The finished ground level in respect of Work No. 1 is between 7.9 metres AOD and 9.9 metres AOD.\nTable 14\n(1) Component\n(2) Maximum length (m)\n(3) Maximum width (m)\n(4) Maximum height (m)\n(5) Maximum diameter (m)\nGas turbine hall building\n76\n76\n30\n-\nHeat recovery steam generator\n63\n28\n50\n-\nElectrical building near heat recovery steam generator\n30\n27\n10\n-\nCombine cycle gas turbine air intake filters (each)\n24\n16\n30\n-\nElectrical building near air intake filter\n39\n16\n10\n-\nGenerator transformer\n30\n24\n15\n-\nFeed water pump building\n64\n23\n20\n-\nDemineralised water treatment plant, fire pumps and laboratory\n57\n33\n20\n-\nDemineralised water storage tank\n-\n-\n20\n25\nGas reception facility\n65\n52\n5\n-\nGas compressors\n50\n20\n10\n-\nAuxiliary boiler\n30\n15\n20\n-\nAuxiliary boiler stacks (each)\n-\n-\n25\n1.5\nCombined cycle gas turbine standby diesel generators\n19\n9\n8\n-\nContinuous emissions monitoring system container\n10\n3\n3\n-\nCooling towers (each)\n240\n27\n25\n-\nCooling water electrical module\n15\n6\n10\n-\nCooling water pumps\n30\n15\n8\n-\nCooling water sampling and dosing plant\n19\n11\n8\n-\nPeaking plant building\n103\n65\n30\n-\nPeaking plant stack(s) (each) (open cycle gas turbine)\n-\n-\n45\n8\nPeaking plant stack(s) (each) (gas engine)\n-\n-\n28\n1.3\nBlack start facility\n55\n43\n30\n-\nBlack start facility stack(s) (each) (open cycle gas turbine)\n-\n-\n45\n2.5\nBlack start facility stack(s) (each) (gas engine)\n-\n-\n25\n1.3\nDiesel tank for black start diesel generator\n-\n-\n12\n4\nElectrical control room and administration building\n85\n24\n20\n-\nElectrical substation\n40\n17\n15\n-\nWorkshop and stores\n51\n20\n12\n-\nRaw and fire water tank\n-\n-\n20\n25\nGas bottle stores (each)\n17\n5\n3\n-\nClosed-circuit cooling water coolers\n15\n10\n10\n-\nWaste water treatment plant\n55\n28\n20\n-\nFirewater and stormwater retention basins\n110\n50\n0\n-\nGatehouse\n12\n12\n5\n-\nTable 15\n(1) Component\n(2) Grid reference of centre point of each stack (using reference system OSGB36 - Ordnance Survey Great Britain 1936)\n(3) Maximum diameter of each stack (m)\n(4) Top of each stack in mAOD\nCombined cycle gas turbine stack\nFirst stack—\n457600\n423933\nSecond Stack—\n457593\n423944\nThird Stack—\n457587\n423933\n9.6\n99.9",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2018/1020/schedule/14/paragraph/3",
    "retrieved_at": "2026-10-28T22:53:55.448034+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}