# The Eggborough Gas Fired Generating Station Order 2018, Paragraph 3


The finished ground level in respect of Work No. 1 is between 7.9 metres AOD and 9.9 metres AOD.
Table 14
(1) Component
(2) Maximum length (m)
(3) Maximum width (m)
(4) Maximum height (m)
(5) Maximum diameter (m)
Gas turbine hall building
76
76
30
-
Heat recovery steam generator
63
28
50
-
Electrical building near heat recovery steam generator
30
27
10
-
Combine cycle gas turbine air intake filters (each)
24
16
30
-
Electrical building near air intake filter
39
16
10
-
Generator transformer
30
24
15
-
Feed water pump building
64
23
20
-
Demineralised water treatment plant, fire pumps and laboratory
57
33
20
-
Demineralised water storage tank
-
-
20
25
Gas reception facility
65
52
5
-
Gas compressors
50
20
10
-
Auxiliary boiler
30
15
20
-
Auxiliary boiler stacks (each)
-
-
25
1.5
Combined cycle gas turbine standby diesel generators
19
9
8
-
Continuous emissions monitoring system container
10
3
3
-
Cooling towers (each)
240
27
25
-
Cooling water electrical module
15
6
10
-
Cooling water pumps
30
15
8
-
Cooling water sampling and dosing plant
19
11
8
-
Peaking plant building
103
65
30
-
Peaking plant stack(s) (each) (open cycle gas turbine)
-
-
45
8
Peaking plant stack(s) (each) (gas engine)
-
-
28
1.3
Black start facility
55
43
30
-
Black start facility stack(s) (each) (open cycle gas turbine)
-
-
45
2.5
Black start facility stack(s) (each) (gas engine)
-
-
25
1.3
Diesel tank for black start diesel generator
-
-
12
4
Electrical control room and administration building
85
24
20
-
Electrical substation
40
17
15
-
Workshop and stores
51
20
12
-
Raw and fire water tank
-
-
20
25
Gas bottle stores (each)
17
5
3
-
Closed-circuit cooling water coolers
15
10
10
-
Waste water treatment plant
55
28
20
-
Firewater and stormwater retention basins
110
50
0
-
Gatehouse
12
12
5
-
Table 15
(1) Component
(2) Grid reference of centre point of each stack (using reference system OSGB36 - Ordnance Survey Great Britain 1936)
(3) Maximum diameter of each stack (m)
(4) Top of each stack in mAOD
Combined cycle gas turbine stack
First stack—
457600
423933
Second Stack—
457593
423944
Third Stack—
457587
423933
9.6
99.9

---
Source: https://www.legislation.gov.uk/uksi/2018/1020/schedule/14/paragraph/3 (the official version)
Page: https://openlegislation.uk/eggborough-gas-fired-generating-station-order-2018/schedule-14/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.