# The Electricity Act 1989 (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2006, Article 4: Conditions on exemption


The exemption granted by article 3 to SMWFL is subject to compliance with the conditions specified in sub-paragraphs (a) and (b) below—
(a) that SMWFL does not hold a licence under section 6(1)(a) of the Act (licence authorising generation of electricity for supply);
(b) that the Scout Moor generating station is connected to the total system in England and Wales and (except in circumstances outside the reasonable control of SMWFL) does not export more than 100 megawatts of electrical power to it.

---
Source: https://www.legislation.gov.uk/uksi/2006/2978/article/4 (the official version)