Article 3 Designation of documents
For the purposes of section 173(2)(b) of the Act, the following documents are designated—
the Balancing and Settlement Code, being the document of that title required to be prepared pursuant to Standard Condition C3 of transmission licences;
the Connection and Use of System Code, being the document of that title required to be prepared pursuant to Standard Condition C10 of transmission licences;
a Network Code, being a document of that title required to be prepared pursuant to the conditions of a transportation licence to which Standard Special Condition A11 (Network and Uniform Network Code) applies;
the Supply Point Administration Agreement, being the document of that title required to be entered into pursuant to Standard Condition 34A of supply licences granted under section 7A of the Gas Act 1986f1;
the Master Registration Agreement, being the document of that title required to be entered into pursuant to Standard Condition 37 of supply licences granted under section 6 of the Electricity Act 1989; and
the Uniform Network Code, being the document of that title required to be prepared pursuant to Standard Special Condition A11 of transportation licences.
Annotations
Footnotes
- f1
-
1986 c. 44. Section 7A was inserted by the Gas Act 1995 (c. 45), section 6(1).