  "url": "https://openlegislation.uk/electricity-and-gas-energy-companies-obligation-order-2012/article-17",
  "json_url": "https://openlegislation.uk/electricity-and-gas-energy-companies-obligation-order-2012/article-17.json",
  "legislation": "uksi/2012/3018",
  "legislation_title": "The Electricity and Gas (Energy Companies Obligation) Order 2012",
  "legislation_url": "https://openlegislation.uk/electricity-and-gas-energy-companies-obligation-order-2012",
  "path": "article/17",
  "kind": "article",
  "number": "17",
  "heading": "Determining savings for a qualifying boiler repair and replacement",
  "text": "(1) The cost saving for the repair or replacement of a qualifying boiler must be determined in accordance with the following formula—\n(A−B)×N\n(2) In paragraph (1)—\n“A” means the cost of heating the premises (“P”) where the repaired or replaced boiler is situated and, where applicable, heating water at P as determined in accordance with—\n(a)the Standard Assessment Procedure or the Standard Assessment Procedure 2012;\n(b)the Reduced Data Standard Assessment Procedure or RdSAP 2012; or\n(c)an appropriate methodology for calculating the savings approved by the Administrator under article 18,\nwhere the calculation is based on the absence of a working heating system in P;\n“B” means the cost of heating P and, where applicable, heating water at P using, as applicable, the boiler that was repaired or the replacement boiler;\n“N” means—\n(a)in the case of a repair of a qualifying boiler which is accompanied with—\n(i)a year’s warranty, 1;\n(ii)two year’s warranty, 2;\n(b)in the case of a replacement of a qualifying boiler, 12.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in art. 17(2) inserted (1.12.2014) by The Electricity and Gas (Energy Companies Obligation) (Determination of Savings) (Amendment) Order 2014 (S.I. 2014/2897), arts. 1, 5(a)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in art. 17(2) inserted (1.12.2014) by The Electricity and Gas (Energy Companies Obligation) (Determination of Savings) (Amendment) Order 2014 (S.I. 2014/2897), arts. 1, 5(b)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 17 in force at 5.12.2012, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2012/3018/article/17",
    "retrieved_at": "2026-10-29T01:11:31.792416+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}