# The Electricity and Gas (Energy Companies Obligation) Order 2012, Article 2: Interpretation

Extent: E+W+S

In this Order—
“2012 low income and rural document” means the document entitled “Energy Company Obligation, Carbon Saving Community Obligation: Rural and Low Income Areas”, first published on 12th June 2012 and revised on 29th October 2012 and the ISBN of which is 9780108511608;
“2014 low income and rural document” means the document entitled “The Future of the Energy Company Obligation: Small Area Geographies Eligible for ECO CSCO Support”, published by the Department of Energy and Climate Change on 18th July 2014;
“adjoining installation” has the meaning given in article 14(2);
“Administrator” means the Gas and Electricity and Markets Authority established by section 1 of the Utilities Act 2000;
“affordable warmth group” means a group of persons in receipt of the benefits in Schedule 1;
“area of low income” means, in relation to a carbon saving community qualifying action the installation of which is carried out—
(a)on or before 31st March 2014, an area in Great Britain which is described as an area of low income in the 2012 low income and rural document;
(b)on or after 1st April 2014, an area in Great Britain which is described as an area of low income in the 2014 low income and rural document;
“carbon qualifying action” has the meaning given in article 12(3);
“carbon saving” means the lifetime tonnes of carbon dioxide that a qualifying action will save;
“carbon saving community qualifying action” has the meaning given in article 13(5);
“cost saving” means, in relation to a heating qualifying action,—
(a)the heating saving; and
(b)where in addition to a heating saving the action also results in savings in the cost of heating water, the money that would be saved by the action over its expected lifetime in heating water in that home;
“district heating system” means a system that delivers heat through pipes or conduits to two or more domestic premises;
“domestic customer” means a person living in domestic premises in Great Britain who is supplied with electricity or gas at those premises wholly or mainly for domestic purposes;
“domestic energy user” means a person who uses energy in domestic premises in Great Britain wholly or mainly for domestic purposes and includes a person living in a mobile home;
“dual licence-holder” means a person holding a licence under section 6(1)(d) of the Electricity Act 1989 and a licence under section 7A of the Gas Act 1986;
“electricity licence-holder” means a person holding a licence under section 6(1)(d) of the Electricity Act 1989 who does not also hold a licence under section 7A of the Gas Act 1986;
“excess action” has the meaning given by article 21;
“gas licence-holder” means a person holding a licence under section 7A of the Gas Act 1986 who does not also hold a licence under section 6(1)(d) of the Electricity Act 1989;
...
“Green Deal report” means a report produced by a green deal assessor pursuant to a qualifying assessment in accordance with regulation 7 of the Green Deal Framework (Disclosure, Acknowledgment, Redress etc.) Regulations 2012;
“group company” means a licence-holder which is a member of a group of companies; and “group” refers to the group of companies of which the licence-holder is a member;
“group excess action” means a relevant CERT action, within the meaning given in article 21ZA(9), which satisfies article 21ZA(2);
“group of companies” means a holding company and the wholly-owned subsidiaries of that holding company where “holding company” and “wholly-owned” subsidiary have the same meaning as in section 1159 of the Companies Act 2006;
“hard to treat cavity” means—
(a)a cavity wall—
(i)in a building with 3 or more storeys where each storey has cavity walls;
(ii)which a chartered surveyor has reported is not suitable to insulate with standard insulation material or techniques; or
(iii)which a chartered surveyor has reported is not suitable to insulate without substantial remedial works to the building;
(b)a cavity within a cavity wall which is less than 50mm wide;
(c)a cavity found in homes of prefabricated concrete construction or with metal frame cavity walls; or
(d)an uneven cavity formed in walls constructed of natural stone or from natural stone outer leaf and block or brick inner leaf;
“heating qualifying action” has the meaning given in article 15(3);
“heating saving” means, in relation to a heating qualifying action or an excess action, the money that would be saved by that action over its expected lifetime in heating a home to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas;
“householder” has the meaning given in Schedule 2;
“licence-holder” means an electricity licence-holder, a gas licence-holder or a dual licence-holder;
“lifetime tonnes of carbon dioxide” means the amount in tonnes of carbon dioxide that is expected to be saved over the lifetime of a measure installed under this Order;
“mobile home” means a home which is—
(a)a caravan within the meaning of Part I of the Caravan Sites and Control of Development Act 1960 (disregarding the amendment made by section 13(2) of the Caravan Sites Act 1968); and
(b)used as a dwelling for the purposes of Part I or II of the Local Government Finance Act 1992;
“MtCO2” means million lifetime tonnes of carbon dioxide;
“new supplier” has the meaning given in article 4(3);
“notification period” means—
(a)1st January 2011 to 31st December 2011 for phase 1;
(b)1st January 2012 to 31st December 2012 for phase 2;
(c)1st January 2013 to 31st December 2013 for phase 3,
and references in this Order, in relation to a phase, to the relevant notification period is to the notification period for that phase;
“overall obligation period” has the meaning given in article 6;
“phase” means one of the three phases as follows—
(a)the period beginning with 1st January 2013 and ending with 31st March 2013 (“phase 1”);
(b)the twelve months ending with 31st March 2014 (“phase 2”); and
(c)the twelve months ending with 31st March 2015 (“phase 3”);
“Publicly Available Specification” means—
(a)in relation to an excess action or a qualifying action the installation of which is carried out before the second amending Order comes into force, the Publicly Available Specification 2030:2012; or
(b)in relation to a qualifying action the installation of which is carried out after the second amending Order comes into force, the Publicly Available Specification 2030:2014, Edition 1;
“qualifying action” means a carbon qualifying action, a carbon saving community qualifying action or a heating qualifying action;
“qualifying boiler” means—
(a)in the case of a boiler to be repaired, a boiler which the Administrator is satisfied—
(i)is not functioning efficiently or has broken down; and
(ii)has a seasonal energy efficiency value of not less than 86% when assessed against the Standard Assessment Procedure;
(b)in the case of a boiler to be replaced, a boiler which the Administrator is satisfied—
(i)a boiler which is not functioning efficiently; or
(ii)a boiler which has broken down,
and which cannot be economically repaired;
“qualifying supply” means the supply to domestic customers of 400 gigawatt hours of electricity or 2000 gigawatt hours of gas;
“RdSAP 2012” means the Government’s Reduced Data Standard Assessment Procedure for energy ratings of existing dwellings (2012 Edition, version 9.92);
“recommended measure” means a measure—
(a)recommended in a Green Deal report which has been produced in respect of the domestic premises at which the measure is to be installed; or
(b)recommended in a report by a chartered surveyor pursuant to an assessment of those domestic premises performed for the purpose of identifying measures for improving the energy efficiency of the premises;
“Reduced Data Standard Assessment Procedure” means the Government’s Reduced Data Standard Assessment Procedure for energy ratings of dwellings (2009 Edition, as amended in April 2012, version 9.91);
“reduced phase 3 CERO”, in relation to a supplier, means the reduced phase 3 carbon emissions reduction obligation determined by the Administrator under article 8A;
“relevant in-use factor” means—
(a)where a measure is specified in the first column of the table in Schedule 3, the percentage specified for that measure in the second column of that table; or
(b)in all other cases, 15%;
“relevant year” means 2011, 2012 or 2013;
“rural area” has the meaning given in article 13(8);
“rural requirement” is the requirement placed on a supplier by article 13(4);
“second amending Order” means the Electricity and Gas (Energy Companies Obligation) (Amendment) (No. 2) Order 2014;
“solid wall insulation” means—
(a)internal or external insulation which lowers the U-value of the treated walls ...; or
(b)in the case of a mobile home, internal or external insulation applied to the ceiling, floor or walls which lowers the U-value of those parts of the mobile home to which the insulation is applied;
“a specified adjoining area” means, where an area of low income (“area A”) is—
(a)in England or Wales, an area (if any) adjoining area A which is specified as a “Lower Layer Super Output Area” by the Office of National Statistics for England and Wales, in a document entitled “Mid-2010 Population Estimates for Lower Layer Super Output Areas in England and Wales by Broad Age and Sex” (release date 28th September 2011); or
(b)in Scotland, an area (if any) adjoining area A which is specified by the Scottish Executive as a “Datazone” in a document entitled “SMID Datazone Lookup” (version 3 published on 6th March 2012);
“Standard Assessment Procedure” means the Government’s Standard Assessment Procedure for energy rating of dwellings (2009 Edition, as amended in October 2010);
“Standard Assessment Procedure 2012” means the Government’s Standard Assessment Procedure for energy rating of dwellings (2012 Edition, version 9.92);
“supplier” has the meaning given in article 4;
“total carbon emissions reduction obligation” means—
(a)in respect of a supplier for which the Administrator is required to determine a reduced phase 3 CERO under article 8A, the sum total of carbon emissions reduction obligations which have been determined for the supplier in respect of phases 1 and 2 and the supplier’s reduced phase 3 CERO;
(b)in respect of a supplier for which the Administrator is not required to determine a reduced phase 3 CERO under article 8A, the sum total of carbon emissions reduction obligations which have been determined for the supplier in respect of phases 1 and 2;
“total carbon saving community obligation” means the sum total of carbon savings community obligations which have been determined for a supplier in respect of phases 1, 2 and 3;
“total home heating cost reduction obligation” means the sum total of home heating cost reduction obligations which have been determined for a supplier in respect of phases 1, 2 and 3;
“U-value” means the measure in W/m2K of heat transmission through material;
“working day” means any day other than—
(a)a Saturday, Sunday, Good Friday, or Christmas Day; or
(b)a day which is a bank holiday in England and Wales or Scotland under the Banking and Financial Dealings Act 1971.

---
Source: https://www.legislation.gov.uk/uksi/2012/3018/article/2 (the official version)
Page: https://openlegislation.uk/electricity-and-gas-energy-companies-obligation-order-2012/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

