# The Electricity and Gas (Energy Company Obligation) Order 2023, Article 25: Notification requirements for completed measures

Extent: E+W+S

A measure is notified to the Administrator in accordance with this article if the notification—
(a) is made, in writing, by the participant that promoted the measure;
(b) is made after the measure is completed;
(c) is made on time within the meaning of article 26;
(d) indicates that the notification is made under this article;
(e) is not withdrawn by a notification made under article 28; and
(f) includes such other information relating to the measure as the Administrator may require.

---