# The Electricity (Applications for Consent) Regulations 1990, Regulation 11: Fees payable on applications for consent


(1) Subject to paragraph (2), the fee to be paid to the Secretary of State upon application being made for a consent under section 36 or section 37 shall be as specified in the Table below.
TABLE
Subject matter of application for consent
Fee
Overhead line
£50.00
Generating station
1 Construction or construction and operation of non-nuclear station of megawatt capacity —
(a) not exceeding 200
£5000.00
(b) exceeding 200 but not exceeding 500
£12000.00
(c) exceeding 500
£20000.00
2 Construction or construction and operation of nuclear station of megawatt capacity —
(a) not exceeding 200
£10000.00
(b) exceeding 200 but not exceeding 500
£24000.00
(c) exceeding 500
£40000.00
3 Extension or extension and operation of non-nuclear station resulting in increase in megawatt capacity —
(a) not exceeding 200
£5000.00
(b) exceeding 200 but not exceeding 500
£12000.00
(c) exceeding 500
£20000.00
4 Extension or extension and operation of nuclear station resulting in increase in megawatt capacity —
(a) not exceeding 200
£10000.00
(b) exceeding 200 but not exceeding 500
£24000.00
(c) exceeding 500
£40000.00
5 Extension of station by retrofitting of emission control equipment
£5000.00
6 Any other extension of station
£1000.00
7 Operation only or charge to manner of operation of station
£1000.00
(2) Where the subject matter of an application for a consent under section 36 is two or more of the matters specified under heads 3 to 7 in the Table above, the fee to be paid shall be the higher or highest of the relevant fees there specified.

---
Source: https://www.legislation.gov.uk/uksi/1990/455/regulation/11 (the official version)
Page: https://openlegislation.uk/electricity-applications-for-consent-regulations-1990/regulation-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

