Particulars of the applicant’s proposed arrangements for compliance with the applicable requirements of standard conditions 4 (Basis of Charges for Use of System and Connection to System: Requirements for Transparency), 4B (Requirement to Offer Terms for Use of System and Connection), 5 (Distribution System Planning Standard and Quality of Service), 6 (Safety and Security of Supplies Enquiry Service), 7 (Provision of Information about Theft or Abstraction of Electricity, Damage and Meter Interference), 8 (Provisions Relating to the Connection of Metering Equipment), 9 (Distribution Code) and 19 (Code of Practice on Procedures with Respect to Site Access).

Notes on Part III

Footnotes

f1

In this Part of this Schedule, if the application is for an extension or restriction of a licence, information and documents need only be given in so far as, in any material respect, they differ from or add to the most recent information or documents which were provided in relation to the same requirement—

  1. (i)

    with an application made by the applicant in accordance with these Regulations; or

  2. (ii)

    subsequent to such an application in pursuance of a condition of the applicant’s licence.