A map drawn to an appropriate scale showing the actual or proposed configuration of the distribution system the applicant would operate if the application were granted, showing—

(i)

all electric lines and electrical plant effecting connection to the system operated by any other authorised distributor; and

(ii)

all points through which it is proposed that electricity would be conveyed to the applicant’s distribution system.

Notes on Part III

Footnotes

f1

In this Part of this Schedule, if the application is for an extension or restriction of a licence, information and documents need only be given in so far as, in any material respect, they differ from or add to the most recent information or documents which were provided in relation to the same requirement—

  1. (i)

    with an application made by the applicant in accordance with these Regulations; or

  2. (ii)

    subsequent to such an application in pursuance of a condition of the applicant’s licence.