# The Electricity (Approval of Pattern or Construction and Installation and Certification) (Amendment) Regulations 2002, Paragraph 3


(1) Amend regulation 5 as follows.
(2) In paragraph (1) after “(3)” insert “or (3A)”
(3) After paragraph (3) insert—
“(3A) A meter examiner shall not, unless requested to do so by the person who made the submission, carry out or procure the carrying out of tests in accordance with paragraph (1) if, in connection with the submission,—
(a) a certified test report has been submitted in support of the application for approval in accordance with regulation 4(1)(c); and
(b) he is satisfied—
(i) that the report of the nominated laboratory is sufficient and reliable for the purpose of determining whether the pattern or, as the case may be, the construction or the manner of installation of the meter meets the requirement in paragraph (1); and
(ii) on the basis of the report that the pattern or construction of the meter or the proposed manner of its installation is such that any meter of that pattern or construction or such a meter installed in that manner will be capable of meeting the requirement in sub-paragraph (1).”

---
Source: https://www.legislation.gov.uk/uksi/2002/3129/schedule/paragraph/3 (the official version)
Page: https://openlegislation.uk/electricity-approval-of-pattern-or-construction-and-installation-and-certification-amendment-regulations-2002/schedule/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

