# The Electricity (Exemption from the Requirement for a Generation Licence) (Baillie) Order 2013, Article 2: Interpretation


In this Order—
“the Act” means the Electricity Act 1989;
“the company” means Baillie Windfarm Limited, a company registered in Scotland with company number SC256692;
“the generating station” means the Baillie onshore wind farm, an electricity generating station whose entrance is located at Ordnance Survey map reference ND 0336 6421, near Thurso in Caithness, Scotland;
“the total system” means all transmission systems and distribution systems, located in Great Britain, of holders of licences under section 6(1)(b) and (c) of the Act (transmission and distribution licences).

---
Source: https://www.legislation.gov.uk/uksi/2013/1011/article/2 (the official version)
Page: https://openlegislation.uk/electricity-exemption-from-the-requirement-for-a-generation-licence-baillie-order-2013/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

