OpenLegislation

Article 2 Interpretation

Original text. Later amendments are not shown.

In this Order—

  • “the Act” means the Electricity Act 1989;

  • “the company” means Berry Burn Wind Farm Limited, a company registered in England and Wales with company number 4511914;

  • “the generating station” means the Berry Burn onshore wind farm, an electricity generating station whose entrance is located at Ordnance Survey map reference NJ 06169 45610, near Inverness, Scotland;

  • “the total system” means all transmission systems and distribution systems, located in Great Britain, of holders of licences under section 6(1)(b) and (c) of the Actf1 (transmission and distribution licences).

Annotations

Footnotes

f1

Section 6 was substituted by section 30 of the Utilities Act 2000.