# The Electricity (Exemption from the Requirement for a Generation Licence) (Keadby) (England and Wales) Order 2010, Article 4: Conditions on exemption


The exemption granted by article 3 to Keadby Wind Farm Limited is subject to compliance with the following conditions—
(a) that Keadby Wind Farm Limited does not hold a licence under section 6(1)(a) of the Act (a generation licence);
(b) that Keadby Wind Farm is connected to the total system in England and Wales; and
(c) that, except in circumstances outside the reasonable control of Keadby Wind Farm Limited, Keadby Wind Farm does not export more than 100 megawatts of electrical power to the total system in England and Wales.

---