# The Electricity (Exemption from the Requirement for a Generation Licence) (Lynn and Inner Dowsing) (England and Wales) Order 2009, Article 2: Interpretation


In this Order—
“the Act” means the Electricity Act 1989;
“Centrica (IDW) Limited” means the company of that name registered in Scotland with number SC213642;
“Centrica (LW) Limited” means the company of that name registered in England and Wales with number 04155137;
“Inner Dowsing Wind Farm” means the offshore wind farm known as Inner Dowsing Wind Farm located at Ordnance Survey map reference TF635688, approximately 5 kilometres off the coast of Skegness in Lincolnshire, and approximately 2 kilometres north of Lynn Wind Farm;
“Lynn Wind Farm” means the offshore wind farm known as Lynn Wind Farm located at Ordnance Survey map reference TF645627, approximately 5 kilometres off the coast of Skegness in Lincolnshire, and approximately 2 kilometres south of Inner Dowsing Wind Farm; and
“total system in England and Wales” has the same meaning as it has in the Electricity (Class Exemptions from the Requirement for a Licence) Order 2001.

---
Source: https://www.legislation.gov.uk/uksi/2009/2344/article/2 (the official version)
Page: https://openlegislation.uk/electricity-exemption-from-the-requirement-for-a-generation-licence-lynn-and-inner-dowsing-england-and-wales-order-2009/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

