The exemption granted by article 3(a) to Centrica (IDW) Limited is subject to compliance with the following conditions—
(a) that Centrica (IDW) Limited does not hold a licence under section 6(1)(a) of the Act (a generation licence);
(b) that Inner Dowsing Wind Farm is connected to the total system in England and Wales; and
(c) that, except in circumstances outside the reasonable control of Centrica (IDW) Limited, Inner Dowsing Wind Farm does not export more than 100 megawatts of electrical power to the total system in England and Wales.

---
Source: https://www.legislation.gov.uk/uksi/2009/2344/article/4 (the official version)
Page: https://openlegislation.uk/electricity-exemption-from-the-requirement-for-a-generation-licence-lynn-and-inner-dowsing-england-and-wales-order-2009/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.