Article 2 Interpretation
In this Order—
-
“the Act” means the Electricity Act 1989;
-
“Cambrian Wind Energy” means Cambrian Wind Energy Limited, registered in England and Wales with number 3343483;
-
“Cefn Croes generating station” means the wind farm known as Cefn Croes Wind Farm situated at Ceredigion in Wales;
-
“Global Renewable Energy Partners” means Global Renewable Energy Partners UK Marine Limited, registered in England and Wales with number 04130301;
-
“licensed generator” means the holder of a licence under section 6(1)(a)f1 of the Act;
-
“licensed transmitter” means the holder of a licence under section 6(1)(b) of the Act;
-
“Kentish Flats generating station” means the offshore wind farm known as Kentish Flats Offshore Wind Farm situated in the outer Thames Estuary at Kentish Flats approximately 8.5 kilometres north of Herne Bay, Kent; and
-
“total system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.
Annotations
Footnotes
- f1
-
Section 6 was substituted by section 30 of the Utilities Act 2000.