# The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003, Article 6: Conditions on exemption


(1) The exemption granted by article 4 to Global Renewable Energy Partners is subject to compliance with the conditions specified in paragraph (2) below.
(2) (a) Global Renewable Energy Partners is not a licensed generator.
(b) The Kentish Flats generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Global Renewable Energy Partners.

---