OpenLegislation

Article 6 Conditions on exemptions

Original text. Later amendments are not shown.

The exemption granted by article 3(3) to Solway Offshore is subject to compliance with the following conditions—

(a)

Solway Offshore is not a licensed generator; and

(b)

the Solway Offshore generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Solway Offshore.