In this Order—
“the Act” means the Electricity Act 1989;
“CRW” means Crystal Rig Wind Farm Limited, registered in England and Wales with number 4364525;
“Crystal Rig generating station” means the wind farm known as the Crystal Rig Wind Farm situated at Cranshaws, Duns, Berwickshire, Scotland;
“licensed generator” means the holder of a licence under section 6(1)(a) of the Act;
“licensed distributor” means the holder of a licence under section 6(1)(c) of the Act;
“Paul’s Hill generating station” means the wind farm known as the Paul’s Hill Wind Farm situated at Paul’s Hill, Aberdour, Moray, Scotland;
“PWL” means Paul’s Hill Wind Limited, registered in England and Wales with number 4364516;
“Rothes generating station” means the wind farm known as the Rothes Wind Farm situated at Cairn Uish, Rothes, Moray, Scotland;
“RWL” means Rothes Wind Limited, registered in England and Wales with number 4364513;

---
Source: https://www.legislation.gov.uk/uksi/2004/1179/article/2 (the official version)
Page: https://openlegislation.uk/electricity-exemption-from-the-requirement-for-a-generation-licence-order-2004/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.