The exemption granted by article 3(1) to Banks Renewables (Middle Muir Wind Farm) Limited in respect of Middle Muir Wind Farm is subject to the conditions that—

(a)

Middle Muir Wind Farm is connected to the total system;

(b)

except in circumstances outside the reasonable control of Banks Renewables (Middle Muir Wind Farm) Limited, Middle Muir Wind Farm does not export more than 100 megawatts of electrical power to the total system; and

(c)

Banks Renewables (Middle Muir Wind Farm) Limited does not hold a licence under section 6(1)(a) of the Act.