# The Electricity (Exemptions from the Requirement for a Generation Licence) Order 2017, Paragraph 4


The exemption granted by article 3(1) to Heck Fen Wind Park Limited in respect of Heckington Fen Wind Park is subject to the conditions that—
(a) Heckington Fen Wind Park is connected to the total system;
(b) except in circumstances outside the reasonable control of Heck Fen Wind Park Limited, Heckington Fen Wind Park does not export more than 100 megawatts of electrical power to the total system; and
(c) Heck Fen Wind Park Limited does not hold a licence under section 6(1)(a) of the Act.

---