# The Electricity from Non-Fossil Fuel Sources Arrangements (England and Wales) Order 2006

S.I. 2006/2388 · made 5 September 2006

This Order modifies certain contracts between certain generators of electricity and the Non-Fossil Purchasing Agency Limited (“the NFPA”). Under the contracts in question, the intention was that, if the generators met certain requirements in terms of supplying heat, they would be paid a ‘premium’ price for the electricity which they generated by the NFPA. If they failed to meet those requirements, then they would receive from the NFPA a ‘reference’ price, fixed at a level below the premium price. Unfortunately, it has since emerged that the way in which the two prices are calculated results in the reference price being higher than the premium price, which has removed the intended financial incentive for generators to meet the requirements placed upon them in relation to supplying heat. The amendment to be made to the contracts in question by this Order will correct this anomaly.

Made under: Utilities Act 2000 (Section 67)

PDFs: Printed copy https://openlegislation.uk/electricity-from-non-fossil-fuel-sources-arrangements-england-and-wales-order-2006/pdf/uksi_20062388_en.pdf; Explanatory Memorandum https://openlegislation.uk/electricity-from-non-fossil-fuel-sources-arrangements-england-and-wales-order-2006/pdf/uksiem_20062388_en.pdf

## Introductory text

ELECTRICITY
Made 5th September 2006
Laid before Parliament 8th September 2006
Coming into force 1st October 2006
The Secretary of State, in exercise of the powers conferred by section 67(1)(c) of the Utilities Act 2000, makes the following Order:—

## 1 Citation, commencement and extent

(1) This Order may be cited as the Electricity from Non-Fossil Fuel Sources Arrangements (England and Wales) Order 2006 and shall come into force on 1st October 2006.
(2) This Order extends to England and Wales only.

## 2 Interpretation

In this Order—
“generator” has the meaning given to that term by the NFFO Savings Order;
“new arrangements” has the meaning given to that term by the NFFO Savings Order;
“NFFO 4 Order” means the Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1997;
“NFFO 5 Order” means the Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1998;
“NFFO Savings Order” means the Electricity from Non-Fossil Fuel Sources Saving Arrangements Order 2000;
“nominated person” has the meaning given to that term by the NFFO Savings Order; and
“relevant contracts” means the replacement power purchase agreements which constitute part of the new arrangements made by the nominated person pursuant to the NFFO Savings Order with a generator of a non-fossil fuel generating station described in Part V of Schedule 1 to the NFFO 4 Order or in Part III of Schedule 1 to the NFFO 5 Order and which are described further in the Schedule.

## 3 Contracts

With effect from the coming into force of this Order, clause 14.2 of each of the relevant contracts shall be amended by deleting the final sentence of clause 14.2 and substituting the following—
“If the Seller is not entitled to the Premium Price the price for Relevant Metered Output for the relevant Period of the Order shall be the lower of the Premium Price and the Reference Price within the meaning of the following sentence. For the purposes of this clause 14.2 “Reference Price” shall mean “Reference Price” as defined in clause 1.1 except that the reference to the “NFFO Contracts” in paragraph (A)(i) of that definition shall be a reference only to those NFFO Contracts within the Relevant Technology Band.”.

## Signature

Maragaret Hodge
Minister for Industry and the Regions
Department of Trade and Industry
5th September 2006

## Relevant contracts

Contract
Date entered into
Facility
Generator
1.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Edmonton B CHP Plant
London Waste Limited
2.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
City Energy CHP
Dreh Resources Limited
3.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
City Energy Portsmouth CHP
Dreh Resources Limited
4.
Renewables NFFO 4 Replacement Power Purchase Agreement BSC Exemptible Contract
08.03.2001
Start Regen
Heron Trust Limited
5.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
City Energy Sheffield CHP
Dreh Resources Limited
6.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Coventry Waste to Energy Plant
Coventry and Solihull Waste Disposal Company Limited
7.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Raikes Lane CHP
Greater Manchester Waste Limited
8.
Renewables NFFO 4 Replacement Power Purchase Agreement BSC Exemptible Contract
08.03.2001
Fibrepower (Slough)
Fibrepower (Slough) Limited
9.
Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract
04.03.2002
Huddersfield Waste to Energy Facility
SITA Kirklees Limited
10.
Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Eastcroft
WasteNotts (Reclamation) Limited
11.
Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Party Contract
08.03.2001
Nine Elms CHP
Gent Fairhead Environmental Services Limited
12.
Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract
08.03.2001
Acorn Energy Supplies
Acorn Energy Supplies Limited
13.
Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Philadelphia Power Project
Compact Power Limited
14.
Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract
08.03.2001
Chapel Renewable Energy Centre
Veolia es Aurora Limited
15.
Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract
08.03.2001
Windwhistle Energy Project
Atlantic Energy Limited
16.
Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract
08.03.2001
Dolcoath Energy
Atlantic Energy Limited

## Explanatory note

(This note is not part of the Order)
This Order modifies certain contracts between certain generators of electricity and the Non-Fossil Purchasing Agency Limited (“the NFPA”). Under the contracts in question, the intention was that, if the generators met certain requirements in terms of supplying heat, they would be paid a ‘premium’ price for the electricity which they generated by the NFPA. If they failed to meet those requirements, then they would receive from the NFPA a ‘reference’ price, fixed at a level below the premium price. Unfortunately, it has since emerged that the way in which the two prices are calculated results in the reference price being higher than the premium price, which has removed the intended financial incentive for generators to meet the requirements placed upon them in relation to supplying heat. The amendment to be made to the contracts in question by this Order will correct this anomaly.

---
Source: https://www.legislation.gov.uk/uksi/2006/2388 (the official version)