# The Electricity Generating Stations (Variation of Consents) (England and Wales) Regulations 2013, Regulation 2: Interpretation

Extent: E+W

(1) In these Regulations—
“the Act” means the Electricity Act 1989;
“the EIA Regulations” means the Electricity Works (Environmental Impact Assessment) (England and Wales) Regulations 2017;
“applicant” means a person who has the benefit of a section 36 consent and makes a variation application in respect of it;
“development” has the meaning given in section 55 of the Town and Country Planning Act 1990 (meaning of “development” and “new development”);
“EIA report” has the meaning given in the EIA Regulations;
“generating station” includes a proposed generating station;
“MMO” means Marine Management Organisation;
“offshore generating station” means a generating station that is, or is to be, located within—
(a)waters in or adjacent to England or Wales which are between the mean low water mark and the seaward limits of the territorial sea; or
(b)a Renewable Energy Zone;
“proposed development” means—
(a)the generating station, or extension of a generating station, which the applicant would be authorised to construct under a relevant section 36 consent if that consent were varied as requested in a variation application;
(b)the way in which a generating station so constructed or extended would be authorised to be operated under the relevant section 36 consent as so varied; and
(c)any section 90 development in respect of which section 36 consent is not required;
“relevant planning authority” means, where a variation application, or a request for a section 90 direction which accompanies the variation application—
(a)relates to a generating station, or development ancillary to a generating station, which is or is to be located on land in England or Wales (“relevant land”)—
(i)if the relevant land is situated in a National Park for which a National Park authority is the local planning authority, that National Park authority; and
(ii)where sub-paragraph (i) does not apply, the local planning authority (within the meaning of section 1 of the Town and Country Planning Act 1990 (local planning authorities: general)) within whose area the relevant land is situated; or
(b)relates to an offshore generating station, any of the following bodies—
(i)a local planning authority in England and Wales;
(ii)a planning authority in Scotland (within the meaning of section 1 of the Town and Country Planning (Scotland) Act 1997 (planning authorities)); or
(iii)the Department of the Environment in Northern Ireland,
which are identified by the applicant under regulation 3(1)(e) or by the appropriate authority under regulation 4(7);
“relevant section 36 consent” means the section 36 consent in respect of which a variation application is made;
“section 36 consent” means a consent under section 36 of the Act (consent required for construction etc. of generating stations) to construct, extend or operate a generating station—
(a)in England or Wales;
(b)in waters adjacent to England or Wales up to the seaward limits of the territorial sea; or
(c)in a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions,
including any variations to that consent made under section 36C(4) of the Act (variation of consents under Electricity Act 1989);
“section 90 development” means, where the appropriate authority is the Secretary of State, any development in respect of which—
(a)a section 90 direction was given on granting the relevant section 36 consent; or
(b)the applicant, on making a variation application, requests the Secretary of State to give a section 90 direction;
“section 90 direction” means a direction under section 90(2) or (2ZA) of the Town and Country Planning Act 1990 (deemed planning permission for development with government authorisation); and
“variation application” means an application to vary a section 36 consent made under section 36C(1) of the Act.
(2) In these Regulations, a reference to a numbered regulation is, unless otherwise specified, a reference to that regulation of these Regulations.

---
Source: https://www.legislation.gov.uk/uksi/2013/1570/regulation/2 (the official version)
Page: https://openlegislation.uk/electricity-generating-stations-variation-of-consents-england-and-wales-regulations-2013/regulation-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.