For Schedule 1 to the 2003 Regulations (information to be provided under regulation 4(4) in a request for a guarantee of origin) substitute—

“SCHEDULE 1

INFORMATION TO BE PROVIDED UNDER REGULATION 4(4) IN A REQUEST FOR A GUARANTEE OF ORIGIN

Regulation 4(4)

1.

The name and address of the person requesting the issue of the guarantee of origin (if a body corporate, the registered or principal office) and, if a company, its registered number.

2.

Where the person signing the statement required under regulation 4(5) is not the person making the request, the name and address of the person signing the statement.

3.

Whether the person requesting the issue of the guarantee of origin is the producer of the electricity in respect of which the guarantee of origin is requested and, if not, the name and address of the producer (if a body corporate, the registered or principal office) and, if a company, its registered number.

4.

The energy source from which the electricity (for which the guarantee of origin is requested) was produced.

5.

The start and end dates of production of the electricity (for which the guarantee of origin is requested).

6.

The name (if any), location, type and capacity of the installation where the electricity (for which the guarantee of origin is requested) was produced.

7.

Whether and to what extent the installation specified in paragraph 6 has benefited from investment support through any support scheme and, if so, the name of the scheme.

8.

Whether and to what extent the electricity for which the guarantee of origin is requested has benefited from any United Kingdom support scheme (other than any specified in response to paragraph 7) and, if so, the name of the scheme.

9.

The date on which the installation specified in paragraph 6 became operational.

10.

The quantity of electricity in respect of which the guarantee of origin is requested, together with the total quantity of electricity produced by the installation during the period referred to in paragraph 5.

11.

Such further information or evidence as the Authority may, in the particular circumstances of the case, reasonably require for the purpose of ascertaining the accuracy of the information required to be provided under paragraphs 1 to 10 above or to enable it to be satisfied that any energy source specified in paragraph 4 is a renewable energy source.”.