  "url": "https://openlegislation.uk/electricity-individual-exemption-from-the-requirement-for-a-generation-licence-kype-muir-extension-wind-farm-order-2021/article-4",
  "json_url": "https://openlegislation.uk/electricity-individual-exemption-from-the-requirement-for-a-generation-licence-kype-muir-extension-wind-farm-order-2021/article-4.json",
  "legislation": "uksi/2021/510",
  "legislation_title": "The Electricity (Individual Exemption from the Requirement for a Generation Licence) (Kype Muir Extension Wind Farm) Order 2021",
  "legislation_url": "https://openlegislation.uk/electricity-individual-exemption-from-the-requirement-for-a-generation-licence-kype-muir-extension-wind-farm-order-2021",
  "path": "article/4",
  "kind": "article",
  "number": "4",
  "heading": "Conditions on exemption",
  "text": "The exemption granted by article 3 of this Order is subject to compliance with the following conditions—\n(a) Kype Muir Extension Wind Farm is connected to the total system;\n(b) Kype Muir Extension Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Banks Renewables (Harting Rig Wind Farm) Limited; and\n(c) Banks Renewables (Harting Rig Wind Farm) Limited does not hold a licence under section 6(1)(a) of the Act in relation to Kype Muir Extension Wind Farm.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/510/article/4",
    "retrieved_at": "2026-10-28T22:14:24.930665+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}