Article 4 Conditions on exemption

Original text. Later amendments are not shown.

The exemption granted by article 3 of this Order is subject to compliance with the following conditions—

(a)

Slough Multifuel generating station is connected to the total system;

(b)

Slough Multifuel generating station does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of SSE Slough Multifuel Limited; and

(c)

SSE Slough Multifuel Limited does not hold a licence under section 6(1)(a) of the Act in relation to Slough Multifuel generating station.