# The Electricity (Individual Exemption from the Requirement for a Supply Licence) (Green Volt) (Scotland) Order 2024, Article 2: Interpretation


(1) In this Order—
“the Act” means the Electricity Act 1989;
“generating station area” means the area delineated by a series of straight lines joining, in the sequence given, the grid locations specified in the table in the Schedule;
“Green Volt offshore generating station” means the generating station, or that part of the generating station—
(a) located in offshore waters approximately 80 kilometres from the coast of Aberdeenshire, Scotland, within the limits of the generating station area, and
(b) at which electricity is generated for the purpose of supplying at least one offshore installation;
“Green Volt Offshore Windfarm Limited” means the company of that name registered in Scotland with company number SC698787;
“offshore installation” means an installation in offshore waters which is used for the purposes of, or in connection with, an activity in respect of which a licence has been granted or is required to be granted (as the case may be) under section 2 of the Petroleum (Production) Act 1934 or section 3 of the Petroleum Act 1998 (as that section has effect on the date on which this Order comes into force);
“straight line” means a geodesic line.

---
Source: https://www.legislation.gov.uk/uksi/2024/809/article/2 (the official version)
Page: https://openlegislation.uk/electricity-individual-exemption-from-the-requirement-for-a-supply-licence-green-volt-scotland-order-2024/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.