# The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020, Article 2: Interpretation


In this Order—
“the Act” means the Electricity Act 1989;
“licensed generator” means the holder of a licence under section 6(1)(a) of the Act;
“Lostock Sustainable Energy Plant” means the electricity generating station known as Lostock Sustainable Energy Plant on Griffiths Road in Northwich, Cheshire, whose entrance is situated at Ordnance Survey map reference SJ683740;
“Lostock Sustainable Energy Plant Limited” means the company of that name registered in England and Wales with company number 09511491;
“Rookery South Energy Recovery Facility” means the electricity generating station known as Rookery South Energy Recovery Facility at Rookery Pit, off Green Lane, in Stewartby, Bedford, whose entrance is situated at Ordnance Survey map reference TL014411;
“Rookery South Limited” means the company of that name registered in England and Wales with company number 07094843;
“the total system” means all transmission systems and distribution systems, located in England and Wales, of holders of licences under section 6(1)(b) and (c) of the Act.

---
Source: https://www.legislation.gov.uk/uksi/2020/509/article/2 (the official version)
Page: https://openlegislation.uk/electricity-individual-exemptions-from-the-requirement-for-a-generation-licence-england-order-2020/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

