# The Electricity (Individual Exemptions from the Requirement for a Generation Licence) Order 2019, Article 4: Conditions on exemptions


The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—
(a) Blackcraig Wind Farm is connected to the total system;
(b) Blackcraig Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Blackcraig Wind Farm (Scotland) Limited; and
(c) Blackcraig Wind Farm (Scotland) Limited is not a licensed generator in respect of Blackcraig Wind Farm.

---